Planning application · Limerick City and County Council

six (6) wind turbines with a tip height of 158m…

within the townlands of Ballynisky Graigoor Ballyegny More Kilbradran Ballysteen Dunmoylan , Carrons and Lisbane , Co. Limerick

2561367 · LimerickClosed
Reference
2561367
Planning authority
Limerick City and County Council
Received
19 Dec 2025
Decided
27 Mar 2026
Status
Closed
Use
Industrial
Site area
43.04 ha

Proposed development

six (6) wind turbines with a tip height of 158m, a rotor diameter of 136m and all associated foundations and hardstanding areas. A 38kV on-site substation compound containing a substation building, associated electrical equipment and transformers with separate client side and ESB entrances. The building will contain a control room, switchgear room, ESB room and store room, underground electrical and communications cabling between the wind turbines and on-site substation. Grid Connection Option A: 2.54km-long 38kV underground cable connection from the on-site substation to the existing Carrons substation to the west of the site. Grid Connection Option B: Loop into the existing 38kV onsite overhead line via the proposed 38kV substation. A new temporary site entrance off the L1219 local road to the west of the permanent site entrance for the construction phase only. Upgrade of an existing farm entrance and access track off the L1219 local road in the northwest of the site to serve as a permanent site entrance for the wind farm when operational. Approximately 3.4km of new site access tracks with associated turning areas and drainage. This includes approximately 490m of temporary access tracks which will be reinstated following construction. Upgrade of approximately 470m of existing site access tracks. A 9m-long clear span bridge crossing of the Ahacronane River by an internal site access track to the northwest of turbine T1 and an associated 1.5m x 1.0m relief culvert. A permanent meteorological mast with a height of 90m, a foundation and hardstand. Two (2) material storage areas with a total capacity of approximately 39,300m3. A temporary construction compound with an area of approximately 1,375m2. All associated site development works, including drainage, diversion or undergrounding of low voltage powerlines, landscaping and revegetation. This planning application is accompanied by an Environmental Impact Assessment Report (EIAR) and Natura Impact Statement (NIS) which have been prepared in respect of the construction, operation and decommissioning of the proposed development, and works to facilitate turbine delivery from the port of Foynes to the wind farm site entrance via L6188, N69, L1222, L1220 and L1219. The Applicant is seeking a 10-year planning permission and 35-year operational life, initiating from the date of full commissioning of the entire wind farm. This development is covered by the provisions of the Renewable Energy Directive III (Di

What happens next

Permission was refused on 27 Mar 2026. The applicant may appeal within four weeks of the decision.

For the applicant

Is this your application?

Sign in to follow it through the Limerick planning process, get told when the decision lands, and see which builders and trades are working on similar projects near you. It is free and takes an email address.

Follow this applicationNo cold calls. Nothing is shared unless you choose to.

Nearby applications

Other applications on the Limerick register close to this address.

All Limerick planning applications

About this page: the facts above come from the statutory public planning register kept by Limerick City and County Council and are refreshed weekly (last updated 20 Jul 2026). Applicant names and contact details are not shown. Status labels are PlanningLeads' plain-language reading of the register status and the "Use" label is classified by AI from the public description (see how we use AI); neither is legal advice and the council's file is the record. How we handle this data: privacy notice.

Remove my application from this page

If this is your application and you would rather it did not appear here, tell us and we will take the page down. No account, no questions asked. This is your right to object under GDPR Article 21.