a) The infilling and restoration of the existing quarry void over an area (c. 4.1 ha)…
Barrigone Quarry , Askeaton , Co. Limerick.
Proposed development
a) The infilling and restoration of the existing quarry void over an area (c. 4.1 ha) of existing permitted quarry (05/7029 and ABP 13.QC.2098) using approximately 450,000m³ or 810,000 tonnes of inert soil and stone waste or soil and stone by-product. b) The development will consist of the restoration of the void with either: 1) Inert soil and stone waste (imported inert greenfield and non-greenfield soils and stone, and river dredge spoil) which will result in the Proposed Development operating as a soil recovery facility that requires a waste management licence from the EPA; or, 2) Soil and stone by-product (i.e. essentially virgin soil or equivalent to virgin soil and stone) which will be notified to the EPA as an Article 27 by-product at its source of origin and transported as a by-product material to enable the Site to be restored. The Site would then operate under conditions of planning. c) The proposed development will utilise the permitted quarry infrastructure including internal roads, site office, weighbridge, wheel wash, welfare facilities and other ancillaries to complete the works. d) Upgrades to the existing weighbridge and wheel wash facilities. e) Construction of a soil inspection shed (approximately 120m² in area, 4m height) and refuelling area (hardstanding) located to the west of the existing site office (approximately 16m² hardstanding area). f) Associated minor works to include site access road improvements, upgrade of drainage infrastructure including new fuel/oil interceptor and surface drains on hardstanding. g) All ancillary and associated works. The planning application boundary extends to 17.44 hectares. An Environmental Impact Assessment Report (EIAR) and Natura Impact Statement (NIS) accompanies the planning application. The development comprises an activity that may require a Waste Licence.
What happens next
Permission was granted on 1 Oct 2025. Third parties may appeal within four weeks; after that the permission is final and works can start once a commencement notice is lodged.
Is this your application?
Sign in to follow it through the Limerick planning process, get told when the decision lands, and see which builders and trades are working on similar projects near you. It is free and takes an email address.
Nearby applications
Other applications on the Limerick register close to this address.
About this page: the facts above come from the statutory public planning register kept by Limerick City and County Council and are refreshed weekly (last updated 7 Jul 2026). Applicant names and contact details are not shown. Status labels are PlanningLeads' plain-language reading of the register status and the "Use" label is classified by AI from the public description (see how we use AI); neither is legal advice and the council's file is the record. How we handle this data: privacy notice.
Remove my application from this page
If this is your application and you would rather it did not appear here, tell us and we will take the page down. No account, no questions asked. This is your right to object under GDPR Article 21.