develop the following within Co. Laois: • Linear arrays of solar PV panels on ground…

Kilmullen Ullard or Controversyland Clonanny Lea and Loughmansland Glebe , Portarlington , Co. Laois

2560611 · LaoisClosed
Reference
2560611
Planning authority
Laois County Council
Received
23 Sept 2025
Decided
30 Dec 2025
Status
Closed
Site area
22.7 ha

Proposed development

develop the following within Co. Laois: • Linear arrays of solar PV panels on ground mounted steel supported structures with associated cabling and ducting (including onsite control and switch gear room and underground cable grid connection to the Bracklone 110kV substation); • 2 no. proposed single storey inverter stations; • A co-located Battery Energy Storage System (BESS) park (including 16 no. containers with cells and 4 no. containers with PCS and inverters) with associated security fencing and gates; • Site Perimeter fencing; • 1 no. new site entrance with palisade double security gates; • 1 no. temporary construction compound/carpark/material storage area with associated temporary site offices, parking areas and security fencing; • 1 no. temporary and 1 no. permanent steel storage containers; • Site access tracks including passing and turning bays; • On-site pole mounted CCTV cameras; • 1 no. temporary construction stage Moby Dick type wheel wash systems; • 1 no. Concrete wash out locations (within temporary construction compound); and • All associated and ancillary works The proposed solar farm development spans a total site area measuring 60.36 ha, of which 37.66 ha is located in Co. Kildare and 22.7 ha is located in Co. Laois. Permission is sought for a period of 10 years with an operational period of 40 years. The total capacity of Solar PV on the site is estimated to be 32 MW. An Appropriate Assessment Screening Report (AASR) and Natura Impact Statement (NlS) has been prepared for this development and submitted with this planning application. The development is covered by the provisions of the (RED III) Renewable Energy Directive III (Directive (EU) 2023/2413 ). The planning application is subject to section 34D of the Planning and Development Act, 2000, as amended. When a notice issues in accordance with section 34D(b), the provisions of article 26A of the Planning and Development Regulations 2001 to 2025 shall apply.

What happens next

Permission was refused on 30 Dec 2025. The applicant may appeal within four weeks of the decision.

For the applicant

Is this your application?

Sign in to follow it through the Laois planning process, get told when the decision lands, and see which builders and trades are working on similar projects near you. It is free and takes an email address.

Follow this applicationNo cold calls. Nothing is shared unless you choose to.

Nearby applications

Other applications on the Laois register close to this address.

All Laois planning applications

About this page: the facts above come from the statutory public planning register kept by Laois County Council and are refreshed weekly (last updated 7 Jul 2026). Applicant names and contact details are not shown. Status labels are PlanningLeads' plain-language reading of the register status and the "Use" label is classified by AI from the public description (see how we use AI); neither is legal advice and the council's file is the record. How we handle this data: privacy notice.

Remove my application from this page

If this is your application and you would rather it did not appear here, tell us and we will take the page down. No account, no questions asked. This is your right to object under GDPR Article 21.