Planning application · Kildare County Council

for 1) A 10 Year Planning Permission for the Development. 2) To upgrade the surface…

Kill GAA , Greenhills , Kill

2560210 · KildareGranted
Reference
2560210
Planning authority
Kildare County Council
Received
4 Mar 2025
Decided
22 Aug 2025
Status
Granted
Site area
6.464 ha
Further information requested
28 Apr 2025
Further information received
28 Jul 2025

Proposed development

for 1) A 10 Year Planning Permission for the Development. 2) To upgrade the surface to the existing access road and pedestrian paths from the clubhouse to the rear entrance leading onto Newtown Way. 3) Provide additional car parking spaces along this roadway at various locations. 4) To construct a two storey building with a ground floor area of 200 sq.m and a first floor mezzanine level with a floor area of 119 sq.m. The overall ridge height of this building is to be 7.00 m. The ground floor is to be used as a gym while the mezzanine level is to be used for activities complementary to the gym. This building will be located in the area between the existing skills wall and the playground. 5) Extension of existing new skills wall area surface with associated lighting, fencing and roof netting. 6) To construct a new synthetic astro platform 95 m by 56 m to be used as an all weather pitch at the location of the existing training pitch which is the closest to the clubhouse with associated fencing and lighting. 7) Realigning of Pitch No. 1 & 2 with inclusion of new floodlights, spectator fencing, ball stop netting & associated works. 8) Construction of a new viewing stand between Pitch No. 1 and Pitch No. 2. 9) Construction of dressing room block with public toilets to the ground floor with an area provided within the roof space to be used for club meeting room. The Ground Floor Area will be 324.59 sq.m. and the first floor area will be 137.19 sq.m. The overall ridge height will be 5.955 m. This building is to be constructed between Pitch No. 1 and Pitch No. 2 beside the proposed viewing stand. 10) To upgrade and modernise the existing mezzanine pitch platform (Pitch No. 3) 100m to 138m x 65m to 86m pitch platform which includes re-grading pitch surface levels, drainage, associated fencing, lighting, walking path and services in keeping in line with the proposed pitch development works at Kill Gaa. Upgrade surfaces of existing access road and pedestrian paths as per part of Kill Gaa planning application. 11) Construction of new walking paths and all ancillary site works in association with the above

What happens next

Permission was granted on 22 Aug 2025. Third parties may appeal within four weeks; after that the permission is final and works can start once a commencement notice is lodged.

For the applicant

Is this your application?

Sign in to follow it through the Kildare planning process, get told when the decision lands, and see which builders and trades are working on similar projects near you. It is free and takes an email address.

Follow this applicationNo cold calls. Nothing is shared unless you choose to.

Nearby applications

Other applications on the Kildare register close to this address.

All Kildare planning applications

About this page: the facts above come from the statutory public planning register kept by Kildare County Council and are refreshed weekly (last updated 7 Jul 2026). Applicant names and contact details are not shown. Status labels are PlanningLeads' plain-language reading of the register status and the "Use" label is classified by AI from the public description (see how we use AI); neither is legal advice and the council's file is the record. How we handle this data: privacy notice.

Remove my application from this page

If this is your application and you would rather it did not appear here, tell us and we will take the page down. No account, no questions asked. This is your right to object under GDPR Article 21.