Planning application · Kildare County Council

development on this 3.3 ha site (phase 2 of a 2 phase residential development for some…

within the townlands of Droichead Nua (Newbridge) , and Old Connell Naas Road , Newbridge

2460438 · KildareGranted
Reference
2460438
Planning authority
Kildare County Council
Received
17 May 2024
Decided
28 Nov 2024
Status
Granted
Dwellings
45
Floor area
6,031 m²
Site area
3.3 ha
Further information requested
9 Jul 2024
Further information received
1 Nov 2024

Proposed development

development on this 3.3 ha site (phase 2 of a 2 phase residential development for some 126 no. dwellings on a wide site area of c.4ha) - A) The construction of 86 no. residential dwellings comprising: 45 no. houses (24 no. 3 bedroom dwellings [2 storey] and 21 no. 4 bedroom houses [3 storey]) and 41 no. apartments/duplex apartments in 2 no. 3 storey buildings (comprising 9 no. 1-bedroom, 6 no. 2-bedroom and 6 no. 3-bedroom units) as well as 1 no. 2 bedroom apartment and 1 no. 3 bedroom duplex apartment in a separate end of terrace (3 storey) arrangement in 10 locations throughout the site (with all apartments/duplex units to include balcony or terrace/private amenity space); B) Vehicular/pedestrian and cyclist access from the Naas Road along with upgrades to the existing vehicular, pedestrian, cyclist and public transport infrastructure along the Naas Road including; the installation of new segregated cycle lanes either side of the Naas Road; a relocated bus stop location at the northern section of the Naas Road and upgraded bus stop at the southern section; a toucan pedestrian crossing across the Naas Road, revised carriageway, and enhanced pedestrian pathways; C) The provision of 120 no. surface resident car parking spaces as well as bicycle storage for apartments; internal road and shared surface networks including pedestrian and cycle paths; D) Provision of c. 0.57 ha of public open space including proposed central square, as well as linear parkways as well as outdoor play areas, and landscaped planting; E) Provision of foul and surface water drainage as well as bin stores; public lighting and all associated landscaping and boundary treatment works, site development and infrastructural works, ESB substations, and all ancillary works necessary to facilitate the development (the proposed development will provide all roads, services [foul & attenuation] and landscaping for the Phase 1 and Phase 2 sites)

What happens next

Permission was granted on 28 Nov 2024. Third parties may appeal within four weeks; after that the permission is final and works can start once a commencement notice is lodged.

For the applicant

Is this your application?

Say it is yours and you will see which building firms and trades have asked to work on it, with the contact details they chose to leave. It is free and takes an email address. Nothing is shared with anyone unless you choose to contact them.

Sign in to claim itNo cold calls. Nothing is shared unless you choose to.

Nearby applications

Other applications on the Kildare register close to this address.

All Kildare planning applications

About this page: the facts above come from the statutory public planning register kept by Kildare County Council and are refreshed weekly (last updated 2 Sept 2026). Applicant names and contact details are not shown. Status labels are PlanningLeads' plain-language reading of the register status and the "Use" label is classified by AI from the public description (see how we use AI); neither is legal advice and the council's file is the record. How we handle this data: privacy notice.

Remove my application from this page

If this is your application and you would rather it did not appear here, tell us and we will take the page down. No account, no questions asked. This is your right to object under GDPR Article 21.