Halverstown Townland , Kilcullen , Co. Kildare
Proposed development
for (i) an increase in the total permitted intake of soil and stone and broken rock to the existing licensed soil recovery facility at Halverstown, Kilcullen, Co. Kildare (Planning Ref: 18/453), from 1.2 million tonnes to 2.06 million tonnes and (ii) an extension to the life of the existing facility of 3 years (to December 2029) in order to accommodate the additional soil and stone intake. These works, which are required to implement a revised backfilling and restoration scheme for the former sand and gravel pit will also provide for (i) continued shared use of existing, co-located site facilities, structures and infrastructure (including the site office, staff welfare facilities, weighbridge (with dedicated office), wheelwash, hardstand areas, fuel storage tanks and site access road); (ii) continued soil and stone intake at a rate of up to 300,000 tonnes per annum, of which no more than 95,000 tonnes (per annum) will be managed as waste; (iii) continued separation of any construction and demolition waste (principally concrete, metal, timber, PVC pipework and plastic) inadvertently imported to the facility, prior to removal off-site to authorised waste disposal or recovery facilities; (iv) continued use of a section of the existing concrete block curing shed as a waste inspection and quarantine facility; (v) continued environmental monitoring of noise, dust and groundwater for the duration of the site recovery and restoration activities and for a short period thereafter (and in accordance with current EPA waste licence requirements); (vi) continued temporary stockpiling of topsoil pending its re-use as cover material for final restoration of the site; and (vii) ultimate restoration of the modified final landform to native woodland and grassland habitats. An Environmental Impact Assessment Report (EIAR) and Natura Impact Statement (NIS) have been prepared in respect of this Planning Application. The proposed development requires a waste licence review from the Environmental Protection Agency
What happens next
Permission was granted on 7 Nov 2024. Third parties may appeal within four weeks; after that the permission is final and works can start once a commencement notice is lodged.
Is this your application?
Sign in to follow it through the Kildare planning process, get told when the decision lands, and see which builders and trades are working on similar projects near you. It is free and takes an email address.
About this page: the facts above come from the statutory public planning register kept by Kildare County Council and are refreshed weekly (last updated 7 Jul 2026). Applicant names and contact details are not shown. Status labels are PlanningLeads' plain-language reading of the register status and the "Use" label is classified by AI from the public description (see how we use AI); neither is legal advice and the council's file is the record. How we handle this data: privacy notice.
Remove my application from this page
If this is your application and you would rather it did not appear here, tell us and we will take the page down. No account, no questions asked. This is your right to object under GDPR Article 21.