Development comprising the demolition of the existing single level Lidl Licensed Discount…
existing Lidl Licensed Foodstore , Tralee Road (N22) / Bóthar Hans Liebherr (N72) , Townland of Derreen Killarney Co. Kerry
Proposed development
Lidl Ireland GmbH intends to apply for permission for development comprising the demolition of the existing single level Lidl Licensed Discount Foodstore (1,787.6 sq m Gross Floor Space) and the construction of a new single level mono-pitched Licensed Discount Foodstore with ancillary Infrastructure and associated site development works (all totalling 2,631.5 sq m Gross Floor Space and ranging in height equivalent from 1 to 2 storeys), at this site of approximately 0.941 hectares located at the existing Lidl Licensed Foodstore, Tralee Road (N22) / Bóthar Hans Liebherr (N72), Townland of Derreen, Killarney, Co. Kerry. The development will consist of: The demolition of the existing single level Lidl Licensed Discount Foodstore building (1,787.6 sq m Gross Floor Space) with Net Retail Floor Space of 1,245 sq m; The construction of a new single level mono-pitched Licensed Discount Foodstore (2,517sq m Gross Floor Space) with Net Retail Floor Space of 1,670 sq m to include an ancillary off-licence use and bakery, an entrance pod, public facilities (incl. lobby and toilets), staff facilities (incl. welfare lobbies, toilets, cloak/change rooms, staff canteen, meeting room and operational office), IT room, plant room, delivery area and storage (incl. cold storage), and external covered trolley bay area with 8 no. long term bicycle parking spaces; Rooftop photovoltaic solar panel array totalling 840 sq m; Corporate signage (3 no. building mounted corporate internally illuminated signs, 3 no. wall mounted externally illuminated poster panel display boards, 1 no. externally illuminated poster display board and 1 no. free standing internally illuminated flagpole sign at primary vehicular and pedestrian entrance); 92 no. surface car parking spaces (5 no. disabled, 4 no. parent and child, 2 no. EV charging, 17 no. EV, and 64 no. regular); 28 no. bicycle parking spaces (8 no. long-term undercover and 20 no. short-term uncovered); Boundary treatments, retaining walls, hard and soft landscaping , services (incl. site drainage accommodation works and underground surface water attenuation storage), and all other ancillary infrastructure (incl. ESB substation and switch room building of 24.5 sq m Gross Floor Space) and associated site development works above and below ground level. Primary vehicular and pedestrian access to the proposed new Licensed Discount Foodstore development will be provided via the enhancement of the existing vehicular and pedestrian access from Bótha
What happens next
Permission was granted on 23 Sept 2025. Third parties may appeal within four weeks; after that the permission is final and works can start once a commencement notice is lodged.
Is this your application?
Say it is yours and you will see which building firms and trades have asked to work on it, with the contact details they chose to leave. It is free and takes an email address. Nothing is shared with anyone unless you choose to contact them.
Nearby applications
Other applications on the Kerry register close to this address.
- 2660278Block 1 Reeks Gateway , Ardnamweeley , Killarney Co Kerry.Granted
The construction of (1) An extension of the Ground Floor Unit 2 into the basement. (2) An extension of the Ground Floor Unit 5 into the basement. (3) A new…
- 2660337Cleeny , Killarney , Co. KerryIn Assessment
(A) Construct a single storey extension to the south west side of the existing building to accommodate additional offices and ancillary spaces…
- 2560435Lands at St. Margaret's Road (L3912) & Dr. Hans Liebherr Road (N72) , Derreen , KillarneyOn Site
the demolition of an existing dwelling house and decommissioning of an existing on-site septic tank to facilitate the construction of a residential development…
- 2460114Killarney Court Hotel , Rock Road / Cleeny Roundabout Junction Ardnamweely , KillarneyGranted
Installation of a Biomass Commercial Boiler and Silo Storage Facility at the Killarney Court Hotel
- 2560222Saint Margaret's Road , Derreen , Killarney Co. Kerry.Granted
the construction of a part 1-2 storey dwelling house and all ancillary site development works including the demolition of 2 no. existing shed structures…
- 20639COOLLEGREEN , ST MARGARETS ROAD , KILLARNEYOn Site
CONSTRUCT A DETACHED TWO-STOREY DWELLING HOUSE TO FORM (A) PART RESIDENTIAL ACCOMMODATION AND (B) PART SELF -CONTAINED UNIT TO THE FRONT FOR SHORT TERM LETTING…
About this page: the facts above come from the statutory public planning register kept by Kerry County Council and are refreshed weekly (last updated 2 Sept 2026). Applicant names and contact details are not shown. Status labels are PlanningLeads' plain-language reading of the register status and the "Use" label is classified by AI from the public description (see how we use AI); neither is legal advice and the council's file is the record. How we handle this data: privacy notice.
Remove my application from this page
If this is your application and you would rather it did not appear here, tell us and we will take the page down. No account, no questions asked. This is your right to object under GDPR Article 21.