for the replacement (“restringing”) of the existing OHL circuit conductor wires…
Cashla Barrettspark to Tonacooleen ,
Proposed development
for the replacement (“restringing”) of the existing OHL circuit conductor wires with a new higher capacity conductor between structure no. 81 and 161; the replacement of angle masts in-situ at 3no. locations, with similar structures; the painting of a tower at 1no. location; the replacement of polesets at 54no. locations, with similar structures. The change in structures will result in standardised heights from 16 m to 23 m along the circuit. The majority of the height increases will be between 0.1 m and 2.0 m (at 40no. structures), with 13no. structure replacements resulting in no change in height. Structure no. 109 will increase in height by 3.0 m; the replacement of insulating and ancillary hardware at all structures from structure no. 81 to 160; the replacement of stay wire / anchors and associated fittings at 3no. locations; the replacement of crossarms at 59no. locations; the installation of fibre wrap on phase conductor between structure no. 1 and structure no. 161; all associated temporary site development works to gain access to the existing structures including the removal and reinstatement of 220m of hedgerow / field boundary (estimated using Táilte Éireann data), vegetation clearance and management, disassembly and reassembly of gate posts / piers and removal and reinstatement of existing fencing; and other temporary associated and ancillary site development works required for the purpose of the uprate of the existing circuit, including construction compounds, silt traps, silt fences, vegetation clearance and management, stone tracks, ground protection mats, infrastructure crossing support systems (i.e., guard poles) and a temporary watercourse crossing to access structure no. 160. Where required, an aerial catenary stringing system will be used to facilitate stringing operations over major obstacles, e.g., national roads, rivers, etc. A Natura Impact Statement will be submitted to the Planning Authority with the application
What happens next
Permission was granted on 2 Dec 2025. Third parties may appeal within four weeks; after that the permission is final and works can start once a commencement notice is lodged.
Is this your application?
Say it is yours and you will see which building firms and trades have asked to work on it, with the contact details they chose to leave. It is free and takes an email address. Nothing is shared with anyone unless you choose to contact them.
Nearby applications
Other applications on the Galway register close to this address.
Related
About this page: the facts above come from the statutory public planning register kept by Galway County Council and are refreshed weekly (last updated 19 Sept 2026). Applicant names and contact details are not shown. Status labels are PlanningLeads' plain-language reading of the register status and the "Use" label is classified by AI from the public description (see how we use AI); neither is legal advice and the council's file is the record. How we handle this data: privacy notice.
Remove my application from this page
If this is your application and you would rather it did not appear here, tell us and we will take the page down. No account, no questions asked. This is your right to object under GDPR Article 21.