Planning ref. 19/1287 for developments at Portumna Demense, Portumna
Portumna Demense, Portumna, Fairyhill
4.7 ha · Granted · permission to Aug 2030
Planning application 25250 to Galway County Council: Planning ref. 19/1287 for developments at; Connaught Harbour to Portumna Bridge, Fairyhill following the ESB flood embankment, at Portumna Demense, Portumna, Fairyhill. Granted by the council on 14 November 2025. The register gives the permission's end as 2 August 2030.
Timeline
- Application lodged
- Council granted
- Permission ends (date on the register)
The end date is the one the council register states. An extension or a commencement changes it.
Key facts
Proposed development
of planning ref. 19/1287 for developments at; Connaught Harbour to Portumna Bridge, Fairyhill following the ESB flood embankment, through Lough Derg Water Recreation Park, Portumna to Portumna Forest Park, Portumna Demesne, County Galway. The development consists of two Phases, Phase 1: a new multi-use shared leisure route (Blueway), 2.4km in length, with tailored surface finishes, information, directional and safety signage and all other associated ancillary works. The route commences at Portumna Bridge, crosses over the ESB flood bank via a new timber boardwalk, following along the toe of the flood bank connect to Lough Derg Water Recreation Park. A new cycle advisory lane, marked parking bays upgrade to footpaths shall be constructed at Lough Derg Water Recreation. The route continues through adjacent farm land which connects to OPW lands that lead to the existing access road at Portumna Forest Park. Phase 2: a new 8 berth marina, incorporating boat pump-out at Connaught Harbour, the removal of the two existing buildings and construction of a new car parking area. Located at the existing [name removed] works yard at Portumna bridge the three existing building shall be removed, for the construction of a new car parking and amenity area, including a new timber covered space incorporating a bat roost. Existing footpaths shall be repaired where required and a new Toucan road crossing shall be constructed to connect to the Blueway constructed in Phase 1. The proposal will involve works to or within the curtilage of the following protected structures; Portumna Harbour, Fairyhill (RPS 477) and Portumna Castle, Portumna Demesne (PRS 3785). A Natura Impact Statement have been prepared and included as part of the planning application
Planning status
Permission was granted on 14 Nov 2025. The four-week appeal period has passed with no appeal recorded, so the permission is final. Works can start once a commencement notice is lodged; the register gives its end as 2 Aug 2030.
Is this your application?
Say it is yours and you will see which building firms and trades have asked to work on it, with the contact details they chose to leave. It is free and takes an email address. Nothing is shared with anyone unless you choose to contact them.
Nearby applications
Other applications on the Galway County register close to this address.
- 26233Fairyhill, Lios na Si, PortumnaLodged
and completion of 2 No. 3-bedroom semi detached dwellings in Block 1 as granted under original planning permission 05/2868 and construction of a residential…
- 26227Fairyhill, 46 Shannon park Portumna, Co. GalwayLodged
for; (a) construction of a single storey extension to the rear (south) elevation of an existing end of terrace two storey dwelling & (b) all associated site…
Related
About this page: the facts above come from the statutory public planning register kept by Galway County Council and are refreshed weekly (last updated 21 Sept 2026). Applicant names and contact details are not shown. Status labels are PlanningLeads' plain-language reading of the register status and the "Use" label is classified by AI from the public description (see how we use AI); neither is legal advice and the council's file is the record. How we handle this data: privacy notice.
Remove my application from this page
If this is your application and you would rather it did not appear here, tell us and we will take the page down. No account, no questions asked: we only email you a link to confirm it was you. This is your right to object under GDPR Article 21.