Planning application · Fingal County Council

Construction, operation and decommissioning of a battery energy storage system at Newtown, North Road

Newtown, North Road, Co. Dublin

FW26A/0358E · FingalLodged

Planning application FW26A/0358E to Fingal County Council: Construction, operation and decommissioning of a battery energy storage system, that comprises of one of three battery technology options, at Newtown, North Road. A council decision is due by 13 November 2026.

Timeline

  1. Application lodged
  2. Council decision due

Key facts

Reference
FW26A/0358E
Planning authority
Fingal County Council
Received
21 Sept 2026
Decision due
13 Nov 2026
Status
Lodged
Use
Utilities

Proposed development

The construction, operation and decommissioning of a battery energy storage system (BESS), that comprises of one of three battery technology options (Technology Option 1, Technology Option 2 or Technology Option 3). The technology options for the Project comprise of the following parameters: • Technology Option 1: 18 BESS units (4.2 m H × 2.7 m W × 7.6 m L); 9 MV stations (2.8 m H × 2.2 m W × 8.6 m L); Design Layout 1 (Drawing No. 24052-202). • Technology Option 2: 18 BESS units (4.2 m H × 2.5 m W × 6.1 m L); 9 MV stations (2.9 m H × 2.5 m W × 6.1 m L); Design Layout 2 (Drawing No. 24052-203). • Technology Option 3: 16 BESS units (3.2 m H × 2.5 m W × 6.1 m L); 2 MV stations (2.9 m H × 2.5 m W × 12.2 m L); Design Layout 3 (Drawing No. 24052-204) Construction elements for the proposed project include: • Site access track, hardstanding area, foundations for the Battery Energy Storage System (BESS) and Medium Voltage (MV) stations, BESS switch room building, control building, welfare and spare parts building, 38kV transformer and associated bund, earth and Low Voltage (LV) transformer, Distribution System Operator (DSO) substation, associated drainage infrastructure, and all ancillary works; • Installation of BESS units and MV stations; installation of underground power and communications cables between the BESS, MV stations, DSO substation, and control building; • Construction, use, and decommissioning of a temporary site compound to facilitate the works, along with the construction of a new site entrance; • Provision of a grid connection route from the DSO substation to the Finglas 220/38kV substation; and • All associated site works, including site clearance, ancillary development (such as site drainage), installation of security gates and fencing, permanent and temporary signage. The proposed site will be used as a single purpose site as a BESS facility, supporting the decarbonisation of the electrical grid. Permission is sought for the proposed development for a period of 10 years, with an operational period of 40 years.

Planning status

The application has been lodged and validated. The council has eight weeks to decide, unless it asks for further information. The council's decision is due by 13 Nov 2026.

For the applicant

Is this your application?

Say it is yours and you will see which building firms and trades have asked to work on it, with the contact details they chose to leave. It is free and takes an email address. Nothing is shared with anyone unless you choose to contact them.

Sign in to claim itNo cold calls. Nothing is shared unless you choose to.
Free tool · no account needed

Buying or upgrading a home? Get a free solar, SEAI grant and deep-retrofit report.

Enter an address to see its solar potential, the full SEAI grant it qualifies for, and the BER-uplift economics of a deep retrofit - in one report, in minutes.

Nearby applications

Other applications on the Fingal register close to this address.

All Fingal planning applications

Related

About this page: the facts above come from the statutory public planning register kept by Fingal County Council and are refreshed weekly (last updated 28 Sept 2026). Applicant names and contact details are not shown. Status labels are PlanningLeads' plain-language reading of the register status and the "Use" label is classified by AI from the public description (see how we use AI); neither is legal advice and the council's file is the record. How we handle this data: privacy notice.

Remove my application from this page

If this is your application and you would rather it did not appear here, tell us and we will take the page down. No account, no questions asked: we only email you a link to confirm it was you. This is your right to object under GDPR Article 21.