Planning application · Fingal County Council

A 10 Year PERMISSION for development of a site of c 9.3ha in the townlands

Townlands of Hollystown and Yellow Walls, On part of the former Hollystown golf course lands, Ratoath Road, Hollystown, Dublin 15, D15 C6258.

FW22A/0098 · FingalOn Site

up to 2 storeys · On Site

Planning application FW22A/0098 to Fingal County Council: A 10 Year PERMISSION for development of a site of c 9.3ha in the townlands of Hollystown, at Townlands of Hollystown and Yellow Walls, On part of the former. Granted by the council on 17 November 2022. Work commenced on 3 April 2026.

Timeline

  1. Application lodged
  2. Further information requested
  3. Further information received
  4. Council granted
  5. Work commenced

Key facts

Reference
FW22A/0098
Planning authority
Fingal County Council
Lodged
25 May 2022
Decided
17 Nov 2022
Status
On Site
Use
Civic or community
Floor area
1,985 m²
Further information requested
7 Jul 2022
Further information received
24 Oct 2022
Commenced
3 Apr 2026

Homes and mix

  • ESB substations

Read from the description, not stated on the register. Shown only where the parts add up to the total.

Proposed development

A 10 Year PERMISSION for development of a site of c 9.3ha in the townlands of Hollystown and Yellow Walls on part of the former Hollystown Golf Course lands, Ratoath Road, Hollystown, Dublin 15, D15 C6258. The development will consist of a GAA Cluster Facility including: a) 4 no. floodlit GAA pitches (Pitches No’s 1 to 4) comprising; 1 x synthetic all weather pitch (Pitch No. 2) (145m x 90m with floodlights with a lux level of 350 mounted on 8 no. 20 metre high columns); 2 x sand-based grass pitches (Pitch No’s 3 and 4) (145m x 90m with floodlights with a lux level of 350 mounted on 8 no. 20 metre high columns per pitch);1 x sand-based grass pitch (Pitch No. 1) (145m x 90m with floodlights with a lux level of 500 mounted on 8 no. 30 metre high columns). All pitches will have GAA goal posts and ball stop netting (12m in height and 30m in length) to rear of same, scoreboards and 2 dugouts each, a railing around the perimeter of each of the sand-based pitches and 2.5m sports fencing around the perimeter of the all-weather pitch. The development will also consist of b) the renovation and alteration of the former 2 storey clubhouse (existing area: 678m2) with the alteration of the existing bar area to 2 no. team changing rooms and alteration of existing changing room layouts with new external door access, officials changing room, showers and toilets on the ground floor, retention of existing kitchen facilities, re-purposing of first floor to offices, storage space and team meeting space/multi-purpose room, including removal of external stairs. c) Development of new two-storey extension (area:1,276m2, height: 10.06m) to provide 6 no. team changing rooms, showers and toilets, baths and physio rooms, plant room and toilets for spectators, all on ground floor. Gymnasium, storerooms, office and physio space and team meeting space/multi-purpose room on first floor. New access stairs and lift as well as terrace and green roof and pv solar roof panels. d) the provision of a separate Indoor Training Facility (area: 820m2, height: 7.25m) including a 30m x 20m pitch, team tactics space, toilets, plant room and store for equipment. e) the construction of a Spectator Stand to the east of Pitch No.1 (area: 296m2, height: 7m) to accommodate 500 spectators with partial roof/cover and undercroft equipment store. f) Hurling wall (9m x 9.5m and 5m in height) with fenced in floodlit astro-turf hurling practice area. g) Maintenance and storage building (area: 128m2, height: 4.3m). h) Demolition of existing driving range and pro-shop shed (area: 72m2). In addition the development will include i) a walking/jogging trail with outdoor exercise equipment around perimeter of site, an outdoor training area (30m x 20m) and 100m long speed training area, a new access roadway and pedestrian entrance onto Ratoath Road, 3 no. pedestrian/cycle access gates to adjacent lands to south-east. Car Parking for 54 no. standard car parking spaces, 9 no. universal access spaces and 100 no. overflow spaces for intermittent use with a grasscrete finish, 2 no. coach spaces and bicycle stands for the parking of 100 no. bicycles. j) Earthworks drainage infrastructure and attenuation, an ESB substation (area: 42m2) and switch room, retaining structures, signage, landscaping and all other associated site development works above and below ground level. AI Received 24/10/2022

Planning status

A commencement notice has been lodged: works are under way or about to start.

For the applicant

Is this your application?

Say it is yours and you will see which building firms and trades have asked to work on it, with the contact details they chose to leave. It is free and takes an email address. Nothing is shared with anyone unless you choose to contact them.

Sign in to claim itNo cold calls. Nothing is shared unless you choose to.
Free tool · no account needed

Planning something similar? Check whether you need permission at all.

Since the 2026 regulations many smaller projects are exempt. Answer a few questions about your own job and get the verdict with the regulation it rests on - in about a minute.

Nearby applications

Other applications on the Fingal register close to this address.

All Fingal planning applications

Related

About this page: the facts above come from the statutory public planning register kept by Fingal County Council and are refreshed weekly (last updated 21 Sept 2026). Applicant names and contact details are not shown. Status labels are PlanningLeads' plain-language reading of the register status and the "Use" label is classified by AI from the public description (see how we use AI); neither is legal advice and the council's file is the record. How we handle this data: privacy notice.

Remove my application from this page

If this is your application and you would rather it did not appear here, tell us and we will take the page down. No account, no questions asked: we only email you a link to confirm it was you. This is your right to object under GDPR Article 21.