Planning application · Dun Laoghaire Rathdown County Council

Strategic housing development for student accommodation shall provide for 276no…

0.483ha lands at Baker's Corner, Rochestown Avenue and Kill Avenue, Dun Laoghaire, Co. Dublin, A96TD77

ABP31141121/E · Dun Laoghaire RathdownGranted
Reference
ABP31141121/E
Planning authority
Dun Laoghaire Rathdown County Council
Decided
23 Jul 2026
Status
Granted
Application type
mixed
Floor area
8,677 m²

Proposed development

Permission for a strategic housing development for student accommodation shall provide for 276no. bedspaces with associated facilities, a public house, 2no. commercial units and ESB Substation. The development will include the following: Demolition of existing Bakers Corner Public House approximately 1,378sqm Construction of a replacement public house of approximately 292.4sqm at the Kill Avenue Frontage with adjoining ESB substation (14.4sqm) and switch room (7sqm) Construction of a student accommodation development with an overall gross floor area of approx. 8,677 sqm (internal) in two blocks of 5 to 6 storeys (Bakers Corner Building – Building A) and 4 to 6 storeys (Main Student Accommodation Building – Building B). The development will provide for a total of 276 student bed spaces grouped into 38 no. clusters of six, seven and eight bedrooms with associated kitchen/dining/living areas Ancillary student support facilities are also proposed at ground floor level of the main student accommodation building (Building B), including: a common room/reception (169.2sqm), management office (16.2sqm), administration space (21.3sqm), Post/Comms area (15.4sqm) meeting room (41.6 sqm), store (18.6 sqm), canteen (22.5 sqm), Toilets and Shower Room (38.9 sqm), laundry (27.3 sqm), cinema room (43 sqm), gym (28.3 sqm), and break out space (45 sqm); and at fifth floor level 2no. communal lounges (27.5 sqm and 46.8 sqm(including Kitchenette)); totaling approx. 843.1 sqm. New Public/Urban Square with pedestrian routes, public seating, landscaped spaces and outdoor seating associated with commercial uses; The provision of communal lounges (12.2sqm each) on floors 1 to 4 of the Bakers Corner Building (Building A). The provision of 2no. commercial units (approx. 127.5 sqm and 273.3sqm) at the ground floor level fronting Rochestown Avenue in the Student Accommodation Building ('Building B') and the Bakers Corner Building ('Building A') respectively. The realignment of the existing car parking spaces to provide 34 no. car parking spaces (including 3 no. Accessible car parking spaces), 1 no. loading bay and 330 no. bicycle parking spaces at surface level and in secure stacked cycle parking store. Waste management area (24.8sqm) and plant room (60.9sqm) at ground floor level. Alterations to the existing vehicular and pedestrian entrances from Rochestown Avenue including the provision of a formalised pedestrian route, and the creation of a new pedestrian and cyclist entrance via Kill Avenue. Associated site and infrastructural works including the provision for water services, foul and surface water drainage and connections; attenuation proposals; permeable paving; all landscaping works including the provision of 3 no. roof terraces at fifth floor level (approx. 451 sqm, 150sqm and 60sqm sqm respectively); green roofs (97sqm and 142sqm), boundary treatments, electrical services and all associated site works. The application contains a statement setting out how the proposal will be consistent with the objectives of the relevant development plan. The application contains a statement indicating why permission should be granted for the proposed development, having regard to a consideration specified in section 37(2)(b) of the Planning and Development Act, 2000, as amended, notwithstanding that the proposed development materially contravenes a relevant development plan or local area plan other than in relation to the zoning of the land.

What happens next

Permission was granted on 23 Jul 2026. Third parties may appeal within four weeks; after that the permission is final and works can start once a commencement notice is lodged.

For the applicant

Is this your application?

Sign in to follow it through the Dun Laoghaire Rathdown planning process, get told when the decision lands, and see which builders and trades are working on similar projects near you. It is free and takes an email address.

Follow this applicationNo cold calls. Nothing is shared unless you choose to.

About this page: the facts above come from the statutory public planning register kept by Dun Laoghaire Rathdown County Council and are refreshed weekly (last updated 10 Aug 2026). Applicant names and contact details are not shown. Status labels are PlanningLeads' plain-language reading of the register status and the "Use" label is classified by AI from the public description (see how we use AI); neither is legal advice and the council's file is the record. How we handle this data: privacy notice.

Remove my application from this page

If this is your application and you would rather it did not appear here, tell us and we will take the page down. No account, no questions asked. This is your right to object under GDPR Article 21.