Planning application · Dublin City Council

Development for a 228 No. bedroom Hotel development (referred to as Phase 2B) (including…

Former Irish Glass Bottle & Fabrizia Sites, Poolbeg West, Dublin 4

WEBPWSDZ1434/25 · DublinIn Assessment
Reference
WEBPWSDZ1434/25
Planning authority
Dublin City Council
Received
28 Feb 2025
Decided
12 Mar 2025
Status
In Assessment
Site area
1.506 ha

Proposed development

Pembroke Beach DAC intends to apply for permission for development for a 228 No. bedroom Hotel development (referred to as Phase 2B) (including a café, licenced bar / restaurant, business centre and ancillary elements) on this site of 15.06ha including lands known as the former Irish Glass Bottle & Fabrizia Sites, Poolbeg West, Dublin 4, focused primarily on a net site area of 0.211ha (identified as within the ‘A1 Lands’) in the Poolbeg West Strategic Development Zone (SDZ) Planning Scheme (April 2019) (as amended). The overall site is bounded to the: north-west by Sean Moore Road; north-east by South Bank Road; south-east by Dublin Port lands and Dublin Bay; and south-west by Sean Moore Park. The overall site subsumes the 4.3ha site of the ‘Infrastructure Permission’ (Reg. Ref. PWSDZ3270/19) for which Dublin City Council issued a Notification of Final Decision (10-year Permission) on 28 January 2020, permitting streets, transportation, water services and utilities’ infrastructure; public realm and public amenity spaces (including the Village Green and Dog Park); and temporary landscaping of a school site, to facilitate Phase 1 development as provided for under the Poolbeg West SDZ Planning Scheme (2019) (as amended) as approved by An Bord Pleanála. The proposed Phase 2B Hotel Scheme development will consist of: • Construction of a 228 No. bedroom Hotel development (‘Block Q’) (10,593 sq m GFA (excluding basement)) comprising a 20 No. storey landmark tower (with set-back storey at Sixteenth Floor Level 16) over two levels of basement (2,054 sq m), to provide: Hotel and ancillary uses, café, licenced bar / restaurant and ancillary spaces, business centre; and ancillary back-of-house facilities / spaces (including ESB Substation and associated ancillary rooms, bin store, laundry store, staff changing rooms, staff canteen, staff office and sprinkler tank and associated spaces). • Provision of 8 No. car parking spaces (including 1 No. accessible car parking spaces) and 1 No. service vehicle delivery bay at Basement Level -01, provision of 24 No. secure long-stay bicycle parking spaces for staff at Basement Level -01, and provision of 16 No. new short-stay bicycle parking spaces at surface level for visitors and provision of 1 No. new cargo bicycle parking space at surface level to service the proposed Hotel. • Amendment of the permitted Phase 2 Residential Scheme (Reg. Ref. PWSDZ3700/24) and Phase A Commercial Scheme (Reg. Ref. PWSDZ379/24): • In those external landscaped areas at Ground Floor Level in the immediate curtilage of the proposed Phase 2B Hotel Scheme site (including ‘Gabbard Street’ and ‘South Bank Link Street’) (within the focused site area) to facilitate amendments to permitted layouts, including the omission of 1 No. permitted EV-charging car parking space, the relocation of 1 No. accessible car parking space and 1 No. EV-charging car parking space, the relocation of 20 No. permitted short-stay bicycle parking spaces; provision of 1 No. new loading / pick-up/drop-off bay; addition of an access point on South Bank Link Street for proposed ESB substation, materials, urban tree locations and landscaping; • At substructure level to facilitate connections for vehicular movements, pedestrian movements and services between the permitted and proposed substructures. Accessing and servicing of the proposed Phase 2B Hotel Scheme development will be by way of ‘Gabbard Street’ (previously permitted under the Phase 2 Residential Scheme (Reg. Ref. PWSDZ3700/24) and the Phase A Commercial Scheme (Reg. Ref. PWSDZ3798/24) and also by the permitted vehicular ramp on ‘Ouzel Street’ to / from the basement of the permitted Phase 2 Residential Scheme (Reg. Ref. PWSDZ3700/24). This Application will be accompanied by a Natura Impact Statement (NIS).

What happens next

The council recorded a decision on 12 Mar 2025. The official file has the outcome; a third-party appeal is possible within four weeks of the decision.

For the applicant

Is this your application?

Say it is yours and you will see which building firms and trades have asked to work on it, with the contact details they chose to leave. It is free and takes an email address. Nothing is shared with anyone unless you choose to contact them.

Sign in to claim itNo cold calls. Nothing is shared unless you choose to.

Nearby applications

Other applications on the Dublin register close to this address.

All Dublin planning applications

About this page: the facts above come from the statutory public planning register kept by Dublin City Council and are refreshed weekly (last updated 2 Sept 2026). Applicant names and contact details are not shown. Status labels are PlanningLeads' plain-language reading of the register status and the "Use" label is classified by AI from the public description (see how we use AI); neither is legal advice and the council's file is the record. How we handle this data: privacy notice.

Remove my application from this page

If this is your application and you would rather it did not appear here, tell us and we will take the page down. No account, no questions asked. This is your right to object under GDPR Article 21.