Planning application · Dublin City Council

Development at a c. 0.16 ha site located at Nos. 62-66 Faussagh Avenue, Dublin 7…

62-66 Faussagh Avenue, Cabra, Dublin 7

WEB2447/24 · DublinGranted
Reference
WEB2447/24
Planning authority
Dublin City Council
Received
7 Nov 2024
Decided
8 Aug 2025
Status
Granted
Dwellings
18
Site area
0.16 ha
Further information requested
24 Jun 2025
Further information received
14 Jul 2025

Proposed development

Planning permission for development at a c. 0.16 ha site located at Nos. 62-66 Faussagh Avenue, Dublin 7, D07 KH60, (formerly ‘The Cabra House’) and the adjoining unnamed laneway to the rear and to the west, extending to Faussagh Avenue. The development will principally consist of: the demolition of the part-one, part-two storey detached former licenced public house (950 sq m); the construction of a four-storey building (total gross floor area of 2,082sq m); (comprising a licensed supermarket of 475 sq m at Ground Floor; with 18 No. apartments (13 No. 1-bed units and 5 No. 2-bed units, with balconies or terraces on the north and south elevations). The development will also consist of: private communal open landscaped space at First Floor Level podium over the extended ground floor retail area (320 sq m); circulation spaces; ESB substation and switch room; plant room; waste storage areas; bicycle, cargo bike and motorbike parking; 6 No. resident car parking spaces at the rear accessed via the laneway; sustainable urban drainage systems (including attenuation tank and green roof); boundary treatments, including the provision of a replacement rear gate; associated hard and soft landscaping; all other associated site excavation; infrastructural and site development works above and below ground including changes in level, and associated site servicing (foul and surface water drainage and water supply). The development will also consist of: alterations to the layout of the unnamed laneway to the rear and west including the removal of the existing gate at the entrance; revision to surface layout and road markings. Access to the scheme will be via Faussagh Avenue and the unnamed laneway to the rear.

What happens next

Permission was granted on 8 Aug 2025. Third parties may appeal within four weeks; after that the permission is final and works can start once a commencement notice is lodged.

For the applicant

Is this your application?

Say it is yours and you will see which building firms and trades have asked to work on it, with the contact details they chose to leave. It is free and takes an email address. Nothing is shared with anyone unless you choose to contact them.

Sign in to claim itNo cold calls. Nothing is shared unless you choose to.

Nearby applications

Other applications on the Dublin register close to this address.

All Dublin planning applications

About this page: the facts above come from the statutory public planning register kept by Dublin City Council and are refreshed weekly (last updated 2 Sept 2026). Applicant names and contact details are not shown. Status labels are PlanningLeads' plain-language reading of the register status and the "Use" label is classified by AI from the public description (see how we use AI); neither is legal advice and the council's file is the record. How we handle this data: privacy notice.

Remove my application from this page

If this is your application and you would rather it did not appear here, tell us and we will take the page down. No account, no questions asked. This is your right to object under GDPR Article 21.