Planning application · Dublin City Council

The site is generally bounded by buildings in office use to the south…

Site (c. 0.22ha) at Mespil Court, Mespil Road and Burlington Road, Dublin 4, D04 E516

WEB2434/24 · DublinGranted
Reference
WEB2434/24
Planning authority
Dublin City Council
Received
6 Nov 2024
Decided
20 Dec 2024
Status
Granted
Site area
0.22 ha

Proposed development

The site is generally bounded by buildings in office use to the south, no. 39 Mespil Road (Protected Structure) to the west, and by Mespil Road and the Grand Canal to the north. The development will consist of a 3-storey mixed use building extension comprising: A 2-storey, raised bridge, office extension adjoining the 2nd and 3rd floors of the existing Mespil Court office building on its northwestern elevation; external plant room at 1st floor and office core extending down to ground floor level (total GFA c. 723.5 sqm). Proposed condenser units to the existing office roof. A 3-storey, mixed use building comprising: 1no. café at ground floor, with ancillary storage and staff facilities (total GFA c.107 sqm) and associated external terrace at ground level; 2no. floors of offices at 1st and 2nd floors, with associated support facilities (total GFA c. 254.5 sqm); Roof garden at 1st floor. All ancillary and associated site development, infrastructural, landscaping, signage and site boundary works, including: 30 no. spaces, two tier bike racks in a bicycle store (27.5 sqm); 18. no. semi vertical bike racks to replace existing bike racks; New bin store (13 sqm); 2 no. Sheffield stands in the front curtilage (visitors) and 1 no. Sheffield Stand by the bin store; Ground floor plant room (27 sqm); Signage zones to northern and eastern ground floor elevations of café unit (c.12 sqm total), and totem sign (c.3 sqm) associated with office within front curtilage adjacent to Mespil Road site boundary; Removal of existing boundary wall and railing fronting Mespil Road; and, insertion of new pedestrian access control gate to the eastern boundary pathway, south of the proposed café entrance; Associated green and blue roofs, and drainage for the proposed new works.

What happens next

Permission was granted on 20 Dec 2024. Third parties may appeal within four weeks; after that the permission is final and works can start once a commencement notice is lodged.

For the applicant

Is this your application?

Say it is yours and you will see which building firms and trades have asked to work on it, with the contact details they chose to leave. It is free and takes an email address. Nothing is shared with anyone unless you choose to contact them.

Sign in to claim itNo cold calls. Nothing is shared unless you choose to.

Nearby applications

Other applications on the Dublin register close to this address.

All Dublin planning applications

About this page: the facts above come from the statutory public planning register kept by Dublin City Council and are refreshed weekly (last updated 2 Sept 2026). Applicant names and contact details are not shown. Status labels are PlanningLeads' plain-language reading of the register status and the "Use" label is classified by AI from the public description (see how we use AI); neither is legal advice and the council's file is the record. How we handle this data: privacy notice.

Remove my application from this page

If this is your application and you would rather it did not appear here, tell us and we will take the page down. No account, no questions asked. This is your right to object under GDPR Article 21.