Planning application · Dublin City Council

Change of Use for the ground floor and basement levels at 134 Capel Street…

133-136, Capel Street, Dublin 1, D01 YK09

WEB2240/25 · DublinGranted
Reference
WEB2240/25
Planning authority
Dublin City Council
Received
3 Jun 2025
Decided
27 May 2026
Status
Granted
Site area
0.0226 ha
Further information requested
24 Jul 2025
Further information received
30 Apr 2026

Proposed development

PROTECTED STRUCTURE: Echowood Limited intend to apply for Planning Permission for Change of Use for the ground floor and basement levels at 134 Capel Street, D01 YK09 and 136 Capel Street D01 T2C9 (commercial to restaurant), properties listed wholly or in part as Protected Structures (Ref Numbers: 1214 & 1216) in the Dublin City Council Development Plan 2022-2028. The development will consist of: Alterations to the ground floor and basement levels of 134 and 136 Capel Street for the change of use from commercial to two separate restaurant premises including; the demolition of internal modern partitions, modern display-stand fittings and modern wall panelling both units; the retention and protection with suitable covering of original flooring, cornicing and other features to No.134; replacement basement access stair (for compliant arrangement) to No. 134. Alterations to the Capel Street (east) elevation of both units: the rerouting/ removal of any unnecessary electrical wiring; the removal of modern fascia to the shopfront of No.136; replacement fascia to No. 136; repair and refurbishment of any original shopfront fabric; and the installation of restaurant signage at street level to No. 134. Alterations to the North Elevation of No.134 including: the reinstatement of an existing opening (window) and demolition of approx.2 sq/m area of wall to provide a ‘take-away’ hatch in connection to the proposed restaurant premises and the adjoining rear hotel, accessed through No. 133 Capel Street (Permitted hotel development 4554/23). Renovation to the ground floor and basement levels of both units to include the insertion of new sanitary and kitchen facilities.

What happens next

Permission was granted on 27 May 2026. Third parties may appeal within four weeks; after that the permission is final and works can start once a commencement notice is lodged.

For the applicant

Is this your application?

Say it is yours and you will see which building firms and trades have asked to work on it, with the contact details they chose to leave. It is free and takes an email address. Nothing is shared with anyone unless you choose to contact them.

Sign in to claim itNo cold calls. Nothing is shared unless you choose to.

Nearby applications

Other applications on the Dublin register close to this address.

All Dublin planning applications

About this page: the facts above come from the statutory public planning register kept by Dublin City Council and are refreshed weekly (last updated 2 Sept 2026). Applicant names and contact details are not shown. Status labels are PlanningLeads' plain-language reading of the register status and the "Use" label is classified by AI from the public description (see how we use AI); neither is legal advice and the council's file is the record. How we handle this data: privacy notice.

Remove my application from this page

If this is your application and you would rather it did not appear here, tell us and we will take the page down. No account, no questions asked. This is your right to object under GDPR Article 21.