Planning application · Dublin City Council

PROTECTED STRUCTURE: Proposed new single storey extension to rear with rooflights…

94 Leinster Road, Rathmines, Dublin 6

WEB2203/26 · DublinIn Assessment
Reference
WEB2203/26
Planning authority
Dublin City Council
Received
19 May 2026
Decided
8 Jul 2026
Status
In Assessment
Site area
0.0363 ha
Further information requested
8 Jul 2026

Proposed development

PROTECTED STRUCTURE: Proposed new single storey extension to rear with rooflights and refurbishment of existing house with refurbishment of front door and original windows throughout including shutters, local repairs to roof including slates, valleys and chimneys, repairs to front valley behind parapet, proposed solar panels to roof, replacement of rainwater goods throughout, replacement of existing rooflight. Internally proposed refurbishment including removal of non-original fixtures and fittings including services and shed, insulation of suspended timber floors, replacement of existing concrete floor slab in rear return with new, proposed damp treatment to walls of rear return, proposed insulation of external walls with breathable insulation, repairs to timber floors, ceilings and cornices, insulation to attic floor, new attic hatches and fireproofing along party wall in attic space. Proposed alterations include new opening between front and rear reception rooms at ground floor level, proposed new en-suite and walk-in wardrobe at first floor level including new opening for door to en-suite, proposed removal of window to rear and dropping of cill to floor level, the proposed reconfiguration of the rear return including, at ground floor level the removal of chimneybreast, non-original bathroom, non-original floors, ceilings and windows, proposed new openings to extension and to garden with new double doors, new wc, utility room, kitchen and dining, and at first floor level the proposed removal of chimneybreast, new window opening and window to bedroom, proposed raising cill of bathroom window, new windows to replace non-original, proposed new bathroom, study and bedroom. Proposed redecoration and painting internally including removal of wallpaper throughout, repairs to walls and the sanding and varnishing of floorboards, new plumbing and electrics throughout, local repairs to front gate and painting of railings to front and all associated hard and soft landscaping.

What happens next

The council recorded a decision on 8 Jul 2026. The official file has the outcome; a third-party appeal is possible within four weeks of the decision.

For the applicant

Is this your application?

Say it is yours and you will see which building firms and trades have asked to work on it, with the contact details they chose to leave. It is free and takes an email address. Nothing is shared with anyone unless you choose to contact them.

Sign in to claim itNo cold calls. Nothing is shared unless you choose to.

Nearby applications

Other applications on the Dublin register close to this address.

All Dublin planning applications

About this page: the facts above come from the statutory public planning register kept by Dublin City Council and are refreshed weekly (last updated 2 Sept 2026). Applicant names and contact details are not shown. Status labels are PlanningLeads' plain-language reading of the register status and the "Use" label is classified by AI from the public description (see how we use AI); neither is legal advice and the council's file is the record. How we handle this data: privacy notice.

Remove my application from this page

If this is your application and you would rather it did not appear here, tell us and we will take the page down. No account, no questions asked. This is your right to object under GDPR Article 21.