LAW: Proposal: Pursuant to the requirements of the above…
Waste Energy Facility, Poolbeg Peninsula, Pigeon House Road, Dublin 4, Boiler Station, Park Lane, Spencer Dock, Dublin 2
Proposed development
LAW: Proposal: Pursuant to the requirements of the above, notice is hereby given of the proposal to construct the Initial Phase of the Dublin District Heating Project by Dublin City Council at Dublin Waste to Energy Facility, Poolbeg Peninsula, Dublin 4; Boiler Station at Park Lane, Spencer Dock, Dublin 1; and; proposed tunnel crossing at River Dodder at York Road Dublin 4 and Sir John Rogerson's Quay Dublin 2, to provide for a district heating distribution network to the North Docklands, South Docklands and Poolbeg Peninsula, Dublin 1, 2 and 4, in proximity to Protected Structures, within an overall site of 2.88 ha. The construction of the Initial Phase of the Dublin District Heating Project will comprise the following elements: • Modifications to Existing Plant Room Dublin Waste to Energy Facility: Modifications at the Dublin Waste to Energy Facility to enable harnessing of available heat energy from the plant. This will involve the installation of plant, piping and equipment within the existing permitted District Heating Plant Room. • Proposed Elevated Steel Pipe Bridge: Proposed elevated steel pipe bridge crossing an internal road within the site of the Dublin Waste to Energy Facility site of c. 15m in length with a clearance above the road c. 5.5m to support 4No. district heating pipelines connecting to the district heating network. • District Heating Pipeline Network: c. 150m of the district heating network, within and to the south of the Dublin Waste to Energy Facility site will be installed above ground. • Proposed Dodder River Tunnel: A tunnel, c. 140m in length extending from a location adjacent to York Road on the east, to Sir John Rogerson's Quay on the west. The tunnel will have an internal diameter of c. 2.5m. It will be c. 15m deep, with a minimum cover under the riverbed of c. 6m. The tunnel will include 2No. district heating pipelines, ducting, isolation valves, and ancillary systems including water level monitoring, drain pumps, lighting, ventilation. Above ground elements associated with the tunnel will include covered inspection and maintenance shafts with ground level access points, control kiosks, power kiosks and ventilation units on both sides of the River Dodder. • Modifications of the existing Back-up Boiler Station at Park Lane, Spencer Dock: Modifications to the existing Back-up Boiler Station to increase its capacity from c. 7.2MWth to c. 9MWth. These modifications will include for the upgrade, installation and reconfiguration of piping, plant and equipment of the internal layout of the station. The project will also include installation of a District Heating Pipeline Network comprising the following: - c. 8.5km of parallel buried (minimum cover of 750mm) district heating insulated flow and return pipelines. - c. 240m of parallel district heating insulated pipelines for circulating district heating water between the Dublin Waste to Energy Facility and a future planned thermal storage tank that will be the subject of a future planning application. - Ancillary network infrastructure will include: below ground expansion loops, wired surveillance systems, isolation valves, ducts for carrying fibre optic cables to monitor and control the overall network. above ground operation and maintenance cabinets and electrical mini pillars (600mm x 370mm wide x 210mm deep) at c. 500m intervals along the network. - Open cut methods will be used generally for the construction of the district heating network. However, there will be trenchless crossings under various utilities and services including a crossing of the Former Sea Wall / Ringsend & Pembroke Sewer Record of Protected Structure Ref. No.6797. The development will include all associated plant, waste storage, landscaping, boundary treatments, lighting and all ancillary site and development works to facilitate the proposal. The proposal has undergone Appropriate Assessment Screening in accordance with Article 6(3) of the Habitats Directive (92/43/EEC) and screening for Environmental Impact Assessment under the EIA Directive 2011/92/EU, as amended by Directive 2014/52/EU. In accordance with Article 81 of the Planning & Development Regulations 2001, as amended, the Planning Authority has made a determination and concluded that: (a) The proposed development, either individually or in combination with other plans and projects, is not likely to have a significant effect on any European site(s) and therefore a Stage 2 Appropriate Assessment is not required. (b) There is no real likelihood of significant effects on the environment arising from the proposed development and that the proposed development is not of a class set out under Schedule 5 of the Planning and Development Regulations 2001, as amended, and therefore does not require an Environmental Impact Assessment Report (EIAR). Any person may, within 4 weeks from the date of publication of this notice, apply to An Coimisiún Pleanála for a screening determination as to whether the development would be likely to have significant effects on the environment. Plans and Particulars of the proposed development may be inspected or purchased at a fee not exceeding the reasonable cost of making a copy for a period of 4 weeks from 09/09/2026 during public opening hours at the offices of Dublin City Council, Public Counter, Planning and Property Development Department, Block 4, Ground Floor, Civic Offices, Wood Quay, Dublin 8, Monday - Friday 9.00am to 4.30pm (and other location if applicable). The plans and particulars are also available for inspection online at https://engage.dublincity.ie/en-IE/projects/ddhp-part-8 on the City Council's website www.dublincity.ie A submission or observation in relation to the proposed development, dealing with the proper planning and sustainable development of the area in which the development would be situated, may be made, in writing, to the Executive Manager, Planning and Property Development Department, Dublin City Council, Civic Offices, Wood Quay, Dublin 8, before 4.30pm on 21/10/2026. Submissions or observations may also be made online https://engage.dublincity.ie/en-IE/projects/ddhp-part-8 on the City Council's website www.dublincity.ie before 23.59hrs on 21/10/2026.
What happens next
The application has been lodged and validated. The council has eight weeks to decide, unless it asks for further information. The council's decision is due by 3 Nov 2026.
Is this your application?
Say it is yours and you will see which building firms and trades have asked to work on it, with the contact details they chose to leave. It is free and takes an email address. Nothing is shared with anyone unless you choose to contact them.
Nearby applications
Other applications on the Dublin register close to this address.
- WEB6061/25East Link Toll Plaza, Ringsend , Dublin 4Granted
The replacement of 9 No. single sided illuminated advertising displays and 8 No. double sided illuminated advertising displays with 1 No. single sided digital…
- WEB5707/2590 Ringsend Park, Ringsend, Dublin 4, D04 DE44Granted
Demolition of the existing single storey extension to the rear of the property and the construction of a new 2 storey extension with a flat roof to the rear…
- WEB1196/25St. Patrick's Girls & Boys National School, Cambridge Road, Ringsend, Dublin 4Granted
Demolition of the buildings to the rear of the existing 3-storey boys & girls school, which include the GP Hall with changing facilities & storage…
- 3961/24to the rear of 4-16 Saint Brendan's Cottages, Dublin 4In Assessment
Demolition of the 3 existing vacant shed units and the construction of 3 two-storey…
- WEB1178/26Site to the rear of 4 to 16 Saint Brendan’s Cottages, Irishtown, Dublin 4Closed
Construction of a single storey, two-bedroom house on a site formed from the subdivision of the approved sites for Units 1 & 3 on this site (Plan Ref…
- WEB1149/26Rear of 4 to 16 Saint Brendan's Cottages, Dublin 4Closed
Construction of a single storey, two-bedroom house on a site formed from the subdivision of the approved sites for Units 1 & 3 on this site (Plan Ref…
Related
About this page: the facts above come from the statutory public planning register kept by Dublin City Council and are refreshed weekly (last updated 21 Sept 2026). Applicant names and contact details are not shown. Status labels are PlanningLeads' plain-language reading of the register status and the "Use" label is classified by AI from the public description (see how we use AI); neither is legal advice and the council's file is the record. How we handle this data: privacy notice.
Remove my application from this page
If this is your application and you would rather it did not appear here, tell us and we will take the page down. No account, no questions asked. This is your right to object under GDPR Article 21.