Planning application · Dublin City Council

LAW:Planning and Development Act 2000 (as amended) Planning and Development Regulations…

Dalymount Park, Phibsborough, Dublin 7

5108/26 · DublinLodged
Reference
5108/26
Planning authority
Dublin City Council
Received
22 Apr 2026
Decision due
16 Jun 2026
Status
Lodged

Proposed development

LAW:Planning and Development Act 2000 (as amended) Planning and Development Regulations 2001 (as amended) - Part 8 Proposal: Pursuant to the requirements of the above, notice is hereby given of proposed amendments to the previously permitted Part 8 development located at Dalymount Park, Phibsborough, Dublin 7 (DCC Planning Reference: 4599/23). The original permission sought permission for a new stadium, reorientation of the pitch to a North/South Axis and installing a new sand-based grass pitch, associated concession areas and a new community facilities building and all associated works. A small part of the site to the south (146 sq.m) is located in an Architectural Conservation Area, and no new works are proposed to this area. The proposed amendments consist of: i. A slight increase to the permitted 8,034 capacity stadium (6,240 seated and 1,794 standing spaces) to cater for a total of c. 8,039 patrons catering for 6,240 seated and 1,799 standing; ii. Removal of the previously permitted basement area (622 sq.m); iii. Relocation of the competition area changing room and player facilities from the basement to the Ground floor level of a new proposed single storey building located at the northern end of the West Stand; iv. Relocation of the permitted ancillary facilities located in a single storey building on the northern boundary and reconfiguration and extension of the area to cater for toilets, first aid and a concession space serving the North Terrace patrons. v. A reduction in the floor plate of the community facility building on the ground floor and reconfiguration of the footprint on the first floor resulting in an increase in the overall floor area of the Community Facility to 595sq.m from the previously permitted 585 sq.m; vi. Addition of roof plant to the Community Facility building; vii. Reconfiguration of the concourse areas are proposed to accommodate improved manoeuvrability and to increase the away supporter’s concourse and improve segregation and access; viii. The East and West stands roof design is proposed to be altered from an inverted V shaped roof to a simple V shaped steel structure below a floating roof. No changes are proposed to the stadium roof levels externally; ix. The north, east, south and west stand roof finishes have been altered from the permitted black colour to a light grey tone; x. The addition of a new main entrance to the West Stand; xi. A concession space, toilet facilities and a waste management area is proposed in the eastern stand, along the northern boundary; xii. A single storey catering building is proposed on the west boundary; xiii. The approved first floor office on the East Stand is proposed to be relocated to a new extended first floor level in the West Stand resulting in a larger first floor level in the west stand from that originally permitted; xiv. Internal reconfiguration of the ground and first floor levels of the East and West Stands are proposed to cater for reconfigured spaces and enhanced & efficient layouts; xv. Updated materials and finishes; xvi. An updated attenuation drainage system to be located underneath the permitted playing pitch; and xvii. All associated plant, waste storage, landscaping, boundary treatments, and all ancillary site works to facilitate the proposed modifications. The proposal has undergone Appropriate Assessment Screening in accordance with Article 6(3) of the Habitats Directive (92/43/EEC) and screening for Environmental Impact Assessment under the EIA Directive 2011/92/EU, as amended by Directive 2014/52/EU. In accordance with Article 81 of the Planning & Development Regulations 2001, as amended, the Planning Authority has made a determination and concluded that: (a) The proposed development, either individually or in combination with other plans and projects, is not likely to have a significant effect on any European site(s) and therefore a Stage 2 Appropriate Assessment is not required. (b) There is no real likelihood of significant effects on the environment arising from the proposed development and that the proposed development is not of a class set out under Schedule 5 of the Planning and Development Regulations 2001, as amended, and therefore does not require an Environmental Impact Assessment Report (EIAR). Any person may, within 4 weeks from the date of publication of this notice, apply to An Coimisiún Pleanála for a screening determination as to whether the development would be likely to have significant effects on the environment. Plans and Particulars of the proposed development may be inspected or purchased at a fee not exceeding the reasonable cost of making a copy for a period of 4 weeks from 22/04/26, during public opening hours at the offices of Dublin City Council, Public Counter, Planning and Property Development Department, Block 4, Ground Floor, Civic Offices, Wood Quay, Dublin 8, Monday - Friday 9.00am to 4.30pm (and other location if applicable). The plans and particulars are also available for inspection online at https://engage.dublincity.ie/en-IE/ and on the City Council’s website www.dublincity.ie A submission or observation in relation to the proposed development, dealing with the proper planning and sustainable development of the area in which the development would be situated, may be made, in writing, to the Executive Manager, Planning and Property Development Department, Dublin City Council, Civic Offices, Wood Quay, Dublin 8, before 4.30pm on 05/06/26. Submissions or observations may also be made online https://engage.dublincity.ie/en-IE/ or on the City Council’s website www.dublincity.ie before 23.59hrs on 05/06/26.

What happens next

The application has been lodged and validated. The council has eight weeks to decide, unless it asks for further information. The council's decision is due by 16 Jun 2026.

For the applicant

Is this your application?

Say it is yours and you will see which building firms and trades have asked to work on it, with the contact details they chose to leave. It is free and takes an email address. Nothing is shared with anyone unless you choose to contact them.

Sign in to claim itNo cold calls. Nothing is shared unless you choose to.
Free tool · no account needed

Planning something similar? Check whether you need permission at all.

Since the 2026 regulations many smaller projects are exempt. Answer a few questions about your own job and get the verdict with the regulation it rests on - in about a minute.

Nearby applications

Other applications on the Dublin register close to this address.

All Dublin planning applications

Related

About this page: the facts above come from the statutory public planning register kept by Dublin City Council and are refreshed weekly (last updated 21 Sept 2026). Applicant names and contact details are not shown. Status labels are PlanningLeads' plain-language reading of the register status and the "Use" label is classified by AI from the public description (see how we use AI); neither is legal advice and the council's file is the record. How we handle this data: privacy notice.

Remove my application from this page

If this is your application and you would rather it did not appear here, tell us and we will take the page down. No account, no questions asked. This is your right to object under GDPR Article 21.