Construction of a new 220kV gas insulated switchgear Switchboard building

Poolbeg 220kV Electrical Substation and adjacent land, Pigeon House Road, Dublin 4 on site measuring 3.6haAB[ Ref:.

4057/23 · DublinOn SiteAppeal decided

0.0004 ha · Appeal decided, March 2025

Planning application 4057/23 to Dublin City Council: Construction of a new 220kV gas insulated switchgear Switchboard building measuring 65.2 x 51.8m and 17m high, at Poolbeg 220kV Electrical Substation and adjacent land, Pigeon House. Granted by the council on 29 November 2023; An Coimisiún Pleanála decided the appeal on 19 March 2025. Work commenced on 11 June 2026.

Timeline

  1. Application lodged
  2. Further information requested
  3. Further information received
  4. Council granted
  5. Appealed to An Coimisiún Pleanála
  6. Appeal decided
  7. Work commenced

Key facts

Reference
4057/23
Planning authority
Dublin City Council
Received
30 Jun 2023
Decided
29 Nov 2023
Status
On Site
Use
Utilities
Floor area
4,112 m²
Site area
0.0004 ha
Further information requested
24 Aug 2023
Further information received
5 Oct 2023
Commenced
11 Jun 2026
Appeal
ABP-318795-24 · Appeal decided

Homes and mix

  • 4 car parking spaces

Read from the description, not stated on the register. Shown only where the parts add up to the total.

Proposed development

The development will consist of construction of a new 220kV gas insulated switchgear (GIS) Switchboard building measuring 65.2 x 51.8m and 17m high; construction of 2no. new shunt reactor units (each within a 4.3m x 8.2m x 5.5m enclosure) and 1no. new series reactor unit (within a 4.7m x 12.7m x 16.6m enclosure), associated connections to the 220kV GIS switchboard building an decommissioning and removal of 2no. existing shunt reactors; an extension of the existing internal access road around the new GIS switchgear building and 4no. car parking spaces; all ancillary and associated works to facilitate the development including removal of existing perimeter berm and new 2.6m high boundary fence around extended substation compound, perimeter planting, 3m high lightning protection to new GIS switchboard building, surface water drainage network including an attenuation pond, lighting and laying of 2 temporary cable circuits for the construction and commissioning period connection the existing AIS building to the new GIS switchboard building and all other associated site excavation, raising of site levels, infrastructural and site development works above and below ground. Planning permission is sought for a period of 10 years. A Natura Impact (NIS) will be submitted to the Planning Authority with the application .

Planning status

An Coimisiún Pleanála concluded the appeal on 19 Mar 2025. The official file has the outcome.

Appeal ABP-318795-24 on the An Coimisiún Pleanála website ↗

For the applicant

Is this your application?

Say it is yours and you will see which building firms and trades have asked to work on it, with the contact details they chose to leave. It is free and takes an email address. Nothing is shared with anyone unless you choose to contact them.

Sign in to claim itNo cold calls. Nothing is shared unless you choose to.
Free tool · no account needed

Planning something similar? Check whether you need permission at all.

Since the 2026 regulations many smaller projects are exempt. Answer a few questions about your own job and get the verdict with the regulation it rests on - in about a minute.

Nearby applications

Other applications on the Dublin register close to this address.

All Dublin planning applications

Related

About this page: the facts above come from the statutory public planning register kept by Dublin City Council and are refreshed weekly (last updated 21 Sept 2026). Applicant names and contact details are not shown. Status labels are PlanningLeads' plain-language reading of the register status and the "Use" label is classified by AI from the public description (see how we use AI); neither is legal advice and the council's file is the record. How we handle this data: privacy notice.

Remove my application from this page

If this is your application and you would rather it did not appear here, tell us and we will take the page down. No account, no questions asked: we only email you a link to confirm it was you. This is your right to object under GDPR Article 21.