Planning application · Dublin City Council

Works include the demolition of a single storey, light industrial building at Inchicore Terrace South

Inchicore Terrace South, Dublin 8, D08 R763

3731/23 · DublinOn SiteGranted on appeal

up to 2 storeys · 0.0209 ha · Granted on appeal, January 2025

Planning application 3731/23 to Dublin City Council: Works include the demolition of a single storey, light industrial building, located within stone boundary walls, at Inchicore Terrace South. Granted by the council on 23 January 2024; granted on appeal by An Coimisiún Pleanála on 28 January 2025. Work commenced on 22 June 2026.

Timeline

  1. Application lodged
  2. Further information requested
  3. Further information received
  4. Council granted
  5. Appealed to An Coimisiún Pleanála
  6. Granted on appeal
  7. Work commenced

Key facts

Reference
3731/23
Planning authority
Dublin City Council
Received
11 May 2023
Decided
23 Jan 2024
Status
On Site
Use
Residential
Dwellings
1
Bedrooms
5
Floor area (estimated)
152 m²
Read from the description, not stated on the register.
Site area
0.0209 ha
Further information requested
5 Jul 2023
Further information received
21 Dec 2023
Commenced
22 Jun 2026
Appeal
ABP-319065-24 · Granted on appeal

Proposed development

[name removed] - (RPS. 3300) works include the demolition of a single storey, light industrial building, located within stone boundary walls, with the part retention of blockwork wall forming the east boundary of the site. Removal too of a roller shutter, support beam and concrete blocks from the north boundary, stone wall. Construction of a 2 storey, semi-detached, 5 bedroom house, consisting of a single family dwelling, area 152m2, located within the existing boundary walls. Entrance of the house is via an existing entrance ope, in the north boundary wall, from Inchicore Terrace South. Bicycle parking, bin storage and private open space to be provided within the curtilage. Work also include modifications to the east boundary wall, the maintenance, repair and restoration of the protected stone walls, the extension of the existing drainage system with additional SuDs measures and associated site works.

Planning status

Permission was granted on appeal by An Coimisiún Pleanála on 28 Jan 2025, and a commencement notice has been lodged: works are under way or about to start.

Appeal ABP-319065-24 on the An Coimisiún Pleanála website ↗

For the applicant

Is this your application?

Say it is yours and you will see which building firms and trades have asked to work on it, with the contact details they chose to leave. It is free and takes an email address. Nothing is shared with anyone unless you choose to contact them.

Sign in to claim itNo cold calls. Nothing is shared unless you choose to.
Free tool · no account needed

Planning something similar? Check whether you need permission at all.

Since the 2026 regulations many smaller projects are exempt. Answer a few questions about your own job and get the verdict with the regulation it rests on - in about a minute.

Nearby applications

Other applications on the Dublin register close to this address.

All Dublin planning applications

Related

About this page: the facts above come from the statutory public planning register kept by Dublin City Council and are refreshed weekly (last updated 21 Sept 2026). Applicant names and contact details are not shown. Status labels are PlanningLeads' plain-language reading of the register status and the "Use" label is classified by AI from the public description (see how we use AI); neither is legal advice and the council's file is the record. How we handle this data: privacy notice.

Remove my application from this page

If this is your application and you would rather it did not appear here, tell us and we will take the page down. No account, no questions asked: we only email you a link to confirm it was you. This is your right to object under GDPR Article 21.