35 Year Permission at Rossmore, Carrigtwohill
Rossmore, Carrigtwohill, Co. Cork
Granted · permission to Sept 2031 (estimate)
Planning application 25/6830 to Cork County Council: 35 Year Permission, at Rossmore, Carrigtwohill. Granted by the council on 30 September 2026. The permission normally runs to September 2031 (an estimate: the grant plus five years).
Timeline
- Application lodged
- Council granted
- Permission normally ends (estimate)
The end date is an estimate: the grant plus five years, the normal life of a permission. An extension or a commencement changes it.
Key facts
Proposed development
35 Year Permission. The development will consist of an extension of the existing quarry over an extraction area of c. 12.5 hectares to a level of minus 35mOD, extraction and processing of limestone using industry standard blasting and processing techniques in place at the existing quarry, provision of overburden storage area, provision of a vehicular tunnel underneath the local private road to link the extension area to the existing quarry, operational landscaping including perimeter screening berms around the proposed extension area, restoration of the quarry to natural habitat after-uses, and all related ancillary site works within an overall application area of c. 22.3 hectares. The proposed development, in conjunction with the existing quarry permitted under planning ref. 21/6983 (An Coimisiún Pleanála Ref. ABP-313-903-22), will result in a combined extraction capacity of 500,000 tonnes per annum. The permitted extraction capacity of the existing quarry area will remain unchanged. Permission is sought for thirty-five years plus two years for final restoration (total duration 37 years). An Environmental Impact Assessment Report (EIAR) will be submitted to the Planning Authority with the application.
Planning status
Permission was granted on 30 Sept 2026. The four-week appeal period has passed with no appeal recorded, so the permission is final. Works can start once a commencement notice is lodged; the permission normally runs to Sept 2031 (estimate).
Is this your application?
Say it is yours and you will see which building firms and trades have asked to work on it, with the contact details they chose to leave. It is free and takes an email address. Nothing is shared with anyone unless you choose to contact them.
Nearby applications
Other applications on the Cork County register close to this address.
- 25/5698Rossmore Quarry Rossmore Carrigtwohill Co.CorkGranted
Provision of covered storage shed over existing aggregate storage bays within the existing quarry site. The shed will be c.917.7m2 with a maximum ridge height…
- 24/5822Rossmore Carrigtwohill Co. CorkGranted
(A) Decommission existing septic tank and percolation area serving existing dwelling and (B) install a new septic tank and percolation area.
Related
About this page: the facts above come from the statutory public planning register kept by Cork County Council and are refreshed weekly (last updated 12 Oct 2026). Applicant names and contact details are not shown. Status labels are PlanningLeads' plain-language reading of the register status and the "Use" label is classified by AI from the public description (see how we use AI); neither is legal advice and the council's file is the record. How we handle this data: privacy notice.
Remove my application from this page
If this is your application and you would rather it did not appear here, tell us and we will take the page down. No account, no questions asked: we only email you a link to confirm it was you. This is your right to object under GDPR Article 21.