Planning application · Cork County Council

Utilities development at Glanagow and Corkbeg (townlands), Whitegate

Glanagow and Corkbeg (townlands), Whitegate, Co. Cork, within a total site area of 3.15 hectares within the curtilage of the Whitegate Power Station.

25/6422 · Cork CountyGranted

Granted · permission to Jan 2036 (estimate)

Planning application 25/6422 to Cork County Council at Glanagow and Corkbeg (townlands), Whitegate, within a total site area. Granted by the council on 13 January 2026. The permission normally runs to January 2036 (an estimate: the grant plus ten years, as a ten-year permission was sought).

Timeline

  1. Application lodged
  2. Council granted
  3. Permission normally ends (estimate)

The end date is an estimate: the grant plus ten years (a ten-year permission was sought). An extension or a commencement changes it.

Key facts

Reference
25/6422
Planning authority
Cork County Council
Received
10 Nov 2025
Decided
13 Jan 2026
Status
Granted
Use
Utilities
Floor area (estimated)
552 m²
Read from the description, not stated on the register.

Proposed development

Bord Gáis Energy Limited intend to apply for planning permission for development at Glanagow and Corkbeg (townlands), Whitegate, Co. Cork, within a total site area of 3.15 hectares within the curtilage of the Whitegate Power Station. The proposed development consists of a 10 year Planning Permission for a Grid Stability Service Development including the provision of a synchronous condenser enclosed within a building of approximately 552m² gross floor area and approximately 12.1 metres in height, associated plant and apparatus including 8 no. modular electrical control containers with a combined gross floor area of approximately 238m², 3 no. transformers, external cooling equipment, an external circuit breaker, fuel tank and containerised emergency diesel generator with a gross floor area of approximately 30m². The proposed development also seeks permission for the provision of a 220kV electrical cabling connection to the nearby Glanagow 220kV substation, lightning protection masts, lighting, security fencing, the provision of a new access track and localised widening of existing access road, the removal of 4 no. existing modular buildings (currently in use as offices, staff and storage facilities) and associated foundations, and all associated ancillary site and development works.

Planning status

Permission was granted on 13 Jan 2026. The four-week appeal period has passed with no appeal recorded, so the permission is final. Works can start once a commencement notice is lodged; the permission normally runs to Jan 2036 (estimate).

For the applicant

Is this your application?

Say it is yours and you will see which building firms and trades have asked to work on it, with the contact details they chose to leave. It is free and takes an email address. Nothing is shared with anyone unless you choose to contact them.

Sign in to claim itNo cold calls. Nothing is shared unless you choose to.
Free tool · no account needed

Buying or upgrading a home? Get a free solar, SEAI grant and deep-retrofit report.

Enter an address to see its solar potential, the full SEAI grant it qualifies for, and the BER-uplift economics of a deep retrofit - in one report, in minutes.

Nearby applications

Other applications on the Cork County register close to this address.

All Cork County planning applications

Related

About this page: the facts above come from the statutory public planning register kept by Cork County Council and are refreshed weekly (last updated 21 Sept 2026). Applicant names and contact details are not shown. Status labels are PlanningLeads' plain-language reading of the register status and the "Use" label is classified by AI from the public description (see how we use AI); neither is legal advice and the council's file is the record. How we handle this data: privacy notice.

Remove my application from this page