Planning application · Cork County Council

A large-scale residential development (LRD), comprising of 246 no. residential dwellings…

Cloheen Clonakilty Co. Cork

25/324 · CorkGranted
Reference
25/324
Planning authority
Cork County Council
Received
13 Jun 2025
Decided
24 Nov 2025
Status
Granted

Proposed development

A large-scale residential development (LRD), comprising of 246 no. residential dwellings as follows: 177 no. houses consisting of 3 no. 5-bed dwellings, 41 no. 4-bed dwellings, 90 no. 3-bed dwellings, 31 no. 2-bed dwellings and 12 no. 1-bed sheltered housing units; 6 no. 2-storey 4-unit apartment blocks consisting of 24 no. 2- bed units, and 3 no. 3-storey 15-unit apartment blocks consisting of 36 no. 2-bed units and 9 no. 1-bed units. The proposed development also includes a creche (473.77sqm) with capacity to accommodate 65 no. children. The proposed development will include provision for car parking, including EV charging points and bicycle parking. The proposed development will also include the provision of private, communal, and public open spaces; internal roads and pathways with potential for future links to adjacent lands; pedestrian and cyclist routes; hard and soft landscaping and boundary treatments; waste storage; plant; signage; a new access onto the local hotel road to the east, incorporating bridging of the existing stream with associated works to same, and a new access connecting to the L-9931-0 local road to the west; modifications to car parking at the Clonakilty Park Hotel and the provision of a roundabout; public lighting; new substation; road improvement works and pedestrian facilities at the N71 and Clonakilty Park Hotel junction; all associated site development works; and all drainage and foul sewer infrastructure and network works including connections to the existing networks on the N71 national road and the L-4007-52 local road, and nature-based SuDS measures. This application is accompanied by a Natura Impact Statement (NIS) and an Environmental Impact Assessment Report (EIAR). The application may be inspected online at the following website: www.cloheenlrd.ie

What happens next

Permission was granted on 24 Nov 2025. Third parties may appeal within four weeks; after that the permission is final and works can start once a commencement notice is lodged.

For the applicant

Is this your application?

Say it is yours and you will see which building firms and trades have asked to work on it, with the contact details they chose to leave. It is free and takes an email address. Nothing is shared with anyone unless you choose to contact them.

Sign in to claim itNo cold calls. Nothing is shared unless you choose to.
Free tool · no account needed

Buying or upgrading a home? Get a free solar, SEAI grant and deep-retrofit report.

Enter an address to see its solar potential, the full SEAI grant it qualifies for, and the BER-uplift economics of a deep retrofit - in one report, in minutes.

Nearby applications

Other applications on the Cork register close to this address.

All Cork planning applications

Related

About this page: the facts above come from the statutory public planning register kept by Cork County Council and are refreshed weekly (last updated 21 Sept 2026). Applicant names and contact details are not shown. Status labels are PlanningLeads' plain-language reading of the register status and the "Use" label is classified by AI from the public description (see how we use AI); neither is legal advice and the council's file is the record. How we handle this data: privacy notice.

Remove my application from this page

If this is your application and you would rather it did not appear here, tell us and we will take the page down. No account, no questions asked. This is your right to object under GDPR Article 21.