Construction and operation of a concrete batching plant
Carrigtwohill Quarry Ballyvodock West & Ballynabointra Carrigtwohill Co Cork
Granted · permission to Mar 2030 (estimate)
Planning application 24/6004 to Cork County Council: Construction and operation of a concrete batching plant which will produce up to 70,000m3 of ready-mix concrete annually, at Carrigtwohill Quarry Ballyvodock West & Ballynabointra Carrigtwohill. Granted by the council on 18 March 2025. The permission normally runs to March 2030 (an estimate: the grant plus five years).
Timeline
- Application lodged
- Council granted
- Permission normally ends (estimate)
The end date is an estimate: the grant plus five years, the normal life of a permission. An extension or a commencement changes it.
Key facts
Proposed development
Permission for the construction and operation of a concrete batching plant which will produce up to 70,000m3 of ready-mix concrete annually. This will replace the existing concrete batching plant that was permitted under application reference S/98/4005, which will be dismantled and removed as part of the proposed development. The application area will cover 1.02 hectares and is located within the northern portion of Carrigtwohill Quarry. Carrigtwohill Quarry is an existing active quarry, located within the applicant’s landholding, and covers an area of 91.92 hectares. The proposed concrete batching plant will include concrete plants (x2), 120 tonne cement silos (x8), 50,000L water tanks (x2), storage bins (x10), control cabin/welfare facilities (port-a-loo type unit), conveyor system (x2), washout lagoons, an access ramp and associated drainage infrastructure including a settlement tank and an attenuation tank. Roadstone intends to utilise both virgin aggregates (from Carrigtwohill Quarry) and recycled aggregates from the existing waste facility. Permit on-site (reference WFP-CK-15-0154-02) in accordance with the National End of Waste Criteria for the Recycled aggregates. A Natura Impact Statement will be submitted to the Planning Authority with the application.
Planning status
Permission was granted on 18 Mar 2025. The four-week appeal period has passed with no appeal recorded, so the permission is final. Works can start once a commencement notice is lodged; the permission normally runs to Mar 2030 (estimate).
Is this your application?
Say it is yours and you will see which building firms and trades have asked to work on it, with the contact details they chose to leave. It is free and takes an email address. Nothing is shared with anyone unless you choose to contact them.
Nearby applications
Other applications on the Cork County register close to this address.
- 25/5885Ballyvodock West, Carrigtwohill, Co. CorkGranted
Erection of a hydrogenated vegetable oil (HVO) generator and associated works within the existing Carrigtwohill Quarry. The Carrigtwohill Quarry is an existing…
- 25/4899Ballynabointra Burgesland Midleton Co. CorkClosed
A 20 Year permission for the backfilling of an exhausted quarry void (quarry registration ref: QR078) and acceptance…
- 26/2426Milebush Quarry, Ballynabointra and Burgesland, Midleton, Co. Cork, P25 NV27Lodged
the backfilling of an exhausted quarry void (quarry registration ref: QR078) and acceptance…
Related
About this page: the facts above come from the statutory public planning register kept by Cork County Council and are refreshed weekly (last updated 21 Sept 2026). Applicant names and contact details are not shown. Status labels are PlanningLeads' plain-language reading of the register status and the "Use" label is classified by AI from the public description (see how we use AI); neither is legal advice and the council's file is the record. How we handle this data: privacy notice.
Remove my application from this page
If this is your application and you would rather it did not appear here, tell us and we will take the page down. No account, no questions asked: we only email you a link to confirm it was you. This is your right to object under GDPR Article 21.