Grid & Substations
Proposed development of a 110kV substation and associated works
County
Kildare
Planning authority
Kildare County Council
Case type
SID (Not incl LAP SID cases)
Lodged
June 2025
Official record: An Coimisiún Pleanála case 322843
Full project detail is a Max feature
Unlock the developer/applicant, the connection voltage, exact location, decision & status and environmental flags - plus directory filtering, the map and API/export.
Need the whole pipeline in your own GIS? Enterprise feed licence
Other grid & substations projects
- 10 year permission for Derrynadarragh wind farm comprising of 9 no. wind turbines, onsite 110kV substation, turbine delivery route and a grid connection routeKildare
- Proposed development of a 110kV GIS grid substation, the undergrounding of existing 110kV transmission line and ancillary development,Kildare
- 10 year permission for construction of a 110kV substation and grid connection including ancillary worksKildare
- Proposed 220kV AIS single bay tail-fed electricity substation with the associated grid connection between the proposed substation and the existing Dunnstown 440/200kV substation comprising of 220kV underground electricity cables and all associated site worksKildare
- 'Kildare-Meath Grid Upgrade' - Proposed development of a 400 kV underground cable between Dunstown 400 kV substation and Woodland 400 kV substation.Kildare
- 220 kV Gas Insulated Switchgear substation, 2 no. 220 kV underground circuits forming a loop-in/loop-out to the existing Maynooth-Woodland 220 kV Overhead Line and 6 no. 220 kV underground circuits and associated low voltage and communication underground cabling connecting the proposed substation with electricity transformers within the Intel Ireland Facility, and all associated and ancillary site development works.Kildare