Proposed development of a 600 MW Gas-Fired Generation Station consisting of two open cycle gas turbines(OCGT), each with an output of up to 300 MW, along with backup fuel storage, ancillary structures, and services

County
Dublin
Case type
SID (Not incl LAP SID cases)

Full project detail is a Max feature

Unlock the developer/applicant, this project's capacity (MW), exact location, decision & status and environmental flags - plus directory filtering, the map and API/export.

A free account lets you browse the full directory; Max unlocks per-project detail.

Win work on projects this size.

PlanningLeads tracks strategic infrastructure alongside every planning application and commencement across all 31 local authorities - scored, sized and filtered to your trade.