SolarGrid & Substations

10 year planning permission for the proposed 110kV AIS electricity substation (with 33kV customer compound) to connect to and serve a solar farm, associated loop-in / loop out infrastructure to connect into an existing 110kV overhead transmission line and all associated site works

County
Cork
Case type
SID (Not incl LAP SID cases)

Full project detail is a Max feature

Unlock the developer/applicant, this project's capacity (MW), exact location, decision & status and environmental flags - plus directory filtering, the map and API/export.

A free account lets you browse the full directory; Max unlocks per-project detail.

Win work on projects this size.

PlanningLeads tracks strategic infrastructure alongside every planning application and commencement across all 31 local authorities - scored, sized and filtered to your trade.