demolition
Demolition of all existing waste processing buildings on site and construction of a new modernised multi-processing facility.
County
Dublin
Planning authority
South Dublin County Council
Case type
SID (Not incl LAP SID cases)
Lodged
December 2023
Official record: An Coimisiún Pleanála case 318683
Full project detail is a Max feature
Unlock the developer/applicant, the connection voltage, exact location, decision & status and environmental flags - plus directory filtering, the map and API/export.
Need the whole pipeline in your own GIS? Enterprise feed licence
Other strategic infrastructure projects
- The demolition of the existing two storey dwelling of Bulmer and associated outbuildings and the provision of two no. 110kV transmission lines and a 110kV Gas Insulated Switchgear (GIS) substation compound and Transformers / MV switch room compound along with associated site worksDublin
- Development and operation of an inert landfill facility to backfill the existing quarry to original ground level; progressive restoration of the backfilled quarry to long-term grassland / scrub habitat; establishment and operation of a construction and demolition waste recovery facility; installation and operation of a soil washing plant and all associated site works.Wicklow
- Increase in annual total waste for treatment from currently permitted 235,000 tonnes to 250,000 tonnes, increase in annual amount of hazardous waste from currently permitted 10,000 tonnes to 25,000 tonnes, development of a aqueous waste tank farm, hydrogen generation unit, bottom ash storage building, development of a single storage warehouse, new concrete yard, weather canopy, demolition and rebuilding of an existing single storey modular office and ancillary site works.Meath