Grid & Substations
Proposed development of a 110kV substation with 2 no. control buildings and associated site works.
County
Cork
Planning authority
Cork County Council
Case type
SID (Not incl LAP SID cases)
Lodged
July 2022
Official record: An Coimisiún Pleanála case 314275
Full project detail is a Max feature
Unlock the developer/applicant, the connection voltage, exact location, decision & status and environmental flags - plus directory filtering, the map and API/export.
Need the whole pipeline in your own GIS? Enterprise feed licence
Other grid & substations projects
- Proposed development of a 110kV onsite substation and 110kV Underground Cable (UGC) Grid Connection Route and associated works, associated with the consented Coom Green Energy Park developmentCork
- 10 year planning permission for Maughanaclea Wind Farm consisting of 14 no. wind turbines, a 110kV substation and 110kV underground cabling connection and associated worksCork
- 10 year planning permission for a 110kV AIS electricity substation, an associated loop-in/loop out grid connection into an existing 110kV overhead transmission line and all associated infrastructureCork
- The proposed development will consist of a 10-year planning permission for the construction of 1 Battery Energy Storage System, 1 110kV AIS electrical substation building and 1 single-storey customer substation building and all associated infrastructureCork
- Proposed 220kV Substation and Grid ConnectionCork
- Proposed 110kV electrical substation and associated 110kV infrastructure required to connect a solar farm to the existing Knockraha 220kV substationCork