Wind EnergyGrid & Substations
Windfarm development of 20 no. turbines with 110kV electrical substation and all related site works and ancillary development.
County
Cork
Planning authority
Cork County Council
Case type
SID (Not incl LAP SID cases)
Lodged
January 2022
Official record: An Coimisiún Pleanála case 312606
Full project detail is a Max feature
Unlock the developer/applicant, the connection voltage, exact location, decision & status and environmental flags - plus directory filtering, the map and API/export.
Need the whole pipeline in your own GIS? Enterprise feed licence
Other wind energy projects
- Proposed development of a 110kV onsite substation and 110kV Underground Cable (UGC) Grid Connection Route and associated works, associated with the consented Coom Green Energy Park developmentCork
- 10 year planning permission for Maughanaclea Wind Farm consisting of 14 no. wind turbines, a 110kV substation and 110kV underground cabling connection and associated worksCork
- 10 year planning permission for a 110kV AIS electricity substation, an associated loop-in/loop out grid connection into an existing 110kV overhead transmission line and all associated infrastructureCork
- The proposed development will consist of a 10-year planning permission for the construction of 1 Battery Energy Storage System, 1 110kV AIS electrical substation building and 1 single-storey customer substation building and all associated infrastructureCork
- Proposed 220kV Substation and Grid ConnectionCork
- Proposed 110kV electrical substation and associated 110kV infrastructure required to connect a solar farm to the existing Knockraha 220kV substationCork