retrofit_energyGrid & Substations

Application for a ten year permission for a 110kV Air Insulated Switchgear (AIS) Loop Substation with 400m long overhead line grid connection and all associated site works

County
Offaly
Case type
SID (Not incl LAP SID cases)

Full project detail is a Max feature

Unlock the developer/applicant, this project's capacity (MW), exact location, decision & status and environmental flags - plus directory filtering, the map and API/export.

A free account lets you browse the full directory; Max unlocks per-project detail.

Win work on projects this size.

PlanningLeads tracks strategic infrastructure alongside every planning application and commencement across all 31 local authorities - scored, sized and filtered to your trade.