Grid & Substationshvac_ventilation
Proposed development will form part of the Greenlink Interconnector and will consist of the development of a new converter station, tail station, MV substation and 23km of high voltage direct current (JVDC) electricity cables, 420m of high voltage alternating current (HVAC) cables, 23.42km of fibre optic cable and all associated site works with an overall proposed development site area of 83.8ha.
County
Wexford
Planning authority
Wexford County Council
Case type
SID (Not incl LAP SID cases)
Lodged
December 2020
Official record: An Coimisiún Pleanála case 308906
Full project detail is a Max feature
Unlock the developer/applicant, the connection voltage, exact location, decision & status and environmental flags - plus directory filtering, the map and API/export.
Need the whole pipeline in your own GIS? Enterprise feed licence
Other grid & substations projects
- Proposed 110kV substation to facilitate connection of the permitted Solar Energy DevelopmentWexford
- 110kV substation and 110kV underground grid connectionWexford
- 10 year planning permission for the proposed 110kV AIS Single Bay Tail-Fed electricity substation (with 33kV customer compound) and associated grid connection and site worksWexford
- Proposed new 110kV substation to be located within the boundary of the consented Dennistown Solar Energy Development by way of a 110kV underground grid connection to Wexford 110kV substationWexford
- A 10 years for a development comprises of a 110kV 4-bay C-type electricity substation (with 33kV customer compound) (including two control buildings, lightning protection, perimeter security fencing, security lighting, drainage infrastructure, temporary construction compound) to connect to and serve a proposed solar farm (under Wexford County Council Reg. Ref. 20191272); associated loop-in infrastructrue to tie into an existing 110kV overhead transmission line including underground 110kV cabling and 2 No. new end masts with 110kV line diversion cabling; vehicular entrance and access track from the public road; all associated site development works including formation of berms and landscaping.Wexford
- Proposed electrical substation and associated 110kV and MV infrastructure required to connect ground-mounted solar PV generation to the electricity transmission and all associated ancillary site development works.Wexford