Grid & Substations

Proposed development will form part of the Greenlink Interconnector and will consist of the development of a new converter station, tail station, MV substation and 23km of high voltage direct current (JVDC) electricity cables, 420m of high voltage alternating current (HVAC) cables, 23.42km of fibre optic cable and all associated site works with an overall proposed development site area of 83.8ha.

County
Wexford
Case type
SID (Not incl LAP SID cases)

Full project detail is a Max feature

Unlock the developer/applicant, this project's capacity (MW), exact location, decision & status and environmental flags - plus directory filtering, the map and API/export.

A free account lets you browse the full directory; Max unlocks per-project detail.

Win work on projects this size.

PlanningLeads tracks strategic infrastructure alongside every planning application and commencement across all 31 local authorities - scored, sized and filtered to your trade.