Grid & Substations
Proposed 220kV Independent Power Producer (IPP) GIS substation, High Voltage Lines, Electric Plant and associated Site Development Works
County
Westmeath
Planning authority
Westmeath County Council
Case type
SID (Not incl LAP SID cases)
Lodged
July 2026
Official record: An Coimisiún Pleanála case 324417
Full project detail is a Max feature
Unlock the developer/applicant, the connection voltage, exact location, decision & status and environmental flags - plus directory filtering, the map and API/export.
Need the whole pipeline in your own GIS? Enterprise feed licence
Other grid & substations projects
- Construction of a 110kV substation and associated works.Westmeath
- 220kV Gas Insulated Swtichgear (GIS) Electrical substation and two 220kV underground transmission cables, interface compounds and pylons and associated worksWestmeath
- 10-year permission for a 110kV electrical substation and associated 110kV infrastructure required to connect a solar farm to the existing Mullingar to Kinnegad 110kV overhead line and associated ancillary site development works.Westmeath
- Proposed development of a 220kV Loop In Loop Out (LILO) Gas Insulated Switchgear (GIS) substation, Battery Energy Storage System (BESS) and associated grid connection infrastructureLimerick
- Proposed development of a 220kV Air Insulated Substation (AIS) and Loop-in Grid Connection at Greenhills Solar FarmCork
- Proposed 110 kV Substation at a site fronting onto Steeven?s Lane, Dublin 8Dublin