Planning application · South Dublin County Council

This Application is being made in accordance with the Adamstown Planning Scheme 2014 (as…

A site of approximately 5.12 Ha in the townlands of Gollierstown and Finnstown, south-west of Lucan, Co Dublin

SDZ25A/0013W · South DublinGranted
Reference
SDZ25A/0013W
Planning authority
South Dublin County Council
Received
30 Sept 2025
Decided
24 Nov 2025
Status
Granted
Dwellings
886
Floor area
77,515 m²
Site area
5.12 ha
Further information requested
9 Jun 2025
Further information received
30 Sept 2025

Proposed development

This Application is being made in accordance with the Adamstown Planning Scheme 2014 (as amended) and relates to Phase 2 of development within the 'Adamstown Boulevard Development Area' (Development Area 10) of the Adamstown Strategic Development Zone. The proposed development will principally consist of the construction of 886 No. residential dwellings (39 No. studios, 413 No. 1-bed, 394 No. 2-bed and 40 No. 3-bed) set out in 13 No. buildings (arranged in blocks identified as Nos. 1-9) ranging in height from 3 No. to 9 No. storeys, with a single-storey podium/under croft car park area connecting Blocks 5, 6 and 7. Of the 886 No. units: 840 No. are apartment dwellings, comprised of 39 No. studios, 390 No. 1-bed, 394 No. 2-bed and 17 No. 3-bed; and 46 No. are duplex dwellings, comprised of 23 No. 1-bed and 23 No. 3-bed. The overall development extends to 77,515 sq. m gross floor area, which includes the podium/under croft car park area of 5,456 sq. m gross floor area. The development will also include: 2 No. internal resident communal amenity spaces in Blocks 1 and 9 (totalling 397 sq. m); alterations to the existing 'Farmer's Access Bridge' including changes to bracings and structural supports to facilitate vehicular and pedestrian movements, landscaping and 2 No. cycle stores; vehicular junctions and internal road, cycle and pedestrian network; 357 No. car parking spaces, of which 182 No. are on-street/at-grade and 175 No. are proposed in the podium/under croft car park area at Blocks 5, 6 and 7; 7 No. vehicular set down bays; bus stand; cycle parking (including 5 No. as standalone single-storey plant and cycle store buildings, and 2 No. as cycle stores beneath the 'Farmer's Access Bridge'); plant, including at rooftop; bin storage areas; hard and soft landscaping, including boundary treatments; private amenity spaces (as balconies and terraces facing all aspects); boundary treatments; public lighting; 6 No. sub-stations (including 1 No. as a double sub-station); rooftop lift overruns; rooftop PV arrays; and all associated site and development works above and below ground.

What happens next

Permission was granted on 24 Nov 2025. Third parties may appeal within four weeks; after that the permission is final and works can start once a commencement notice is lodged.

For the applicant

Is this your application?

Say it is yours and you will see which building firms and trades have asked to work on it, with the contact details they chose to leave. It is free and takes an email address. Nothing is shared with anyone unless you choose to contact them.

Sign in to claim itNo cold calls. Nothing is shared unless you choose to.

Nearby applications

Other applications on the South Dublin register close to this address.

All South Dublin planning applications

About this page: the facts above come from the statutory public planning register kept by South Dublin County Council and are refreshed weekly (last updated 2 Sept 2026). Applicant names and contact details are not shown. Status labels are PlanningLeads' plain-language reading of the register status and the "Use" label is classified by AI from the public description (see how we use AI); neither is legal advice and the council's file is the record. How we handle this data: privacy notice.

Remove my application from this page

If this is your application and you would rather it did not appear here, tell us and we will take the page down. No account, no questions asked. This is your right to object under GDPR Article 21.