Local Electoral Area · Fingal County Council

Construction leads in Swords

348 planning applications and commencement notices in Swords in the last twelve months, across 7 electoral divisions. 354 sites are on site right now. Updated weekly from the Fingal planning register and the national building control register.

348
Leads, 12 months
354
On site now
€517m
Pipeline value
Boundary: CSO / Tailte Eireann 2022
Every lead in Swords, on the map

Pro opens the map filtered to this area: every site pinned, scored and sized, with the area shading, trade filters and alerts for new filings.

Top trades in Swords

The work the last twelve months of filings call for, by trade.

Electrical
243 leads
Plumbing & Heating
231 leads
Painting & Decorating
205 leads
Carpentry & Joinery
204 leads
Flooring
204 leads
Plastering, Rendering & Dry Lining
204 leads
Masonry & Blockwork
174 leads
Roofing
174 leads

The housing stock in Swords

16,020 households in Census 2022, set against the national figure (the dark tick). Older homes on oil and solid fuel are where retrofit demand sits.

Age and occupancy

Built before 198022.6%Ireland 41.7%
Built before 19190.9%Ireland 8.6%
Built 2011 or later11%Ireland 7.9%
Vacant homes4%Ireland 7.7%
Holiday homes0.1%Ireland 3.2%

Central heating fuel

Oil13.6%Ireland 40.9%
Mains gas74%Ireland 34.5%
LPG0.4%Ireland 0.7%
Electric10.3%Ireland 12.4%
Solid fuel (coal, peat, wood)0.7%Ireland 9.4%
Other fuel0.4%Ireland 1%
No central heating0.6%Ireland 1.2%
Renewable energy source16.4%Ireland 25.7%

Tenure

Owner occupied66.5%Ireland 68.9%
Private rented24.6%Ireland 18.8%
Social rented8.1%Ireland 10.4%
Pobal deprivation score
+3.4

Relative affluence above the national average (0). A household-weighted mean of Electoral Division scores. Pobal HP Deprivation Index 2022, CC BY 4.0.

Source: CSO Census 2022, Small Area Population Statistics, CC BY 4.0. Shares are rolled up from each electoral division, weighted by households (dwellings for vacancy).

Recent planning applications in Swords

  1. Units 1 & 2, Clonmel House, Forster Way, rear of 29 Main Street, Swords, Co. Dublin
    Amalgamation of units 1 & 2 on the ground floor of Clonmel House, the change of use from retail to proposed office use, internal alterations…
    Closed
    F26A/0910EReceived 8 Oct 2026Decision due 2 Dec 2026
  2. Site at rear of 45 The Granary, Millers Glen, Swords, Dublin, K67E0C1, & 46 The Granary, Millers Glen, Swords, Dublin, K67C2V8
    Two storey creche and 4 no. car parking spaces was previously granted at this site under planning permission F23A/0676. The development consists…
    Lodged
    F26A/0898EReceived 5 Oct 2026Decision due 27 Nov 2026
  3. Lands at Food Central, Saint Margaret’s, Co. Dublin
    RETENTION PERMISSION for (i) the permanent retention and continued office use of 2 no. existing modular buildings previously conditioned under Reg. Ref…
    Lodged
    F26A/0895EReceived 2 Oct 2026Decision due 26 Nov 2026
  4. Rath Lane, Rath, Swords
    Single storey dwelling house, waste water treatment system and percolation area, new vehicular entrance onto public road and all associated site development…
    Lodged
    F26A/0891EReceived 1 Oct 2026Decision due 25 Nov 2026
  5. 2 no. separate sites totalling 0.332 Ha at North Ring Business Park, Santry, Dublin 9.
    The sites are principally located at the parking areas and yard area between the 'Unit M' and 'Unit N' buildings…
    Lodged
    F26A/0894EReceived 1 Oct 2026Decision due 25 Nov 2026
  6. Well Road, School Lane, Swords, K67Y935
    Change of use of an existing 2 storey brewery building know as the Chalk Bar to a hotel now 3 storey with 24 ensuite bedrooms…
    Closed
    F26A/0884EReceived 28 Sept 2026Decision due 20 Nov 2026
  7. Lands at Food Central, Saint Margaret’s, Co. Dublin
    RETENTION PERMISSION for (i) the permanent retention and continued office use of 2 no. existing modular buildings previously conditioned under Reg. Ref…
    Closed
    F26A/0873EReceived 24 Sept 2026Decision due 18 Nov 2026
  8. 9 St Columcilles Park, Swords Demesne, Swords, K67K579
    Re-submitting application with amendments (reference no: F26A/0781E) Alterations to the exterior of front of house…
    Closed
    F26A/0856EReceived 19 Sept 2026Decision due 13 Nov 2026
  9. On Lands to the South of Rathbeale Road and to the North of Main Street and to the East of, Mooretown Distributor Road (Western Distributor Link Road), Mooretown, Swords, Co. Dublin
    Compliance with Conditin 13c of F23A/0504
    Lodged
    F23A/0504/C14/13cReceived 17 Sept 2026Decision due 11 Nov 2026
  10. 98 Santry Close, Santry, Dublin 9, D09 W599
    Demolition of the existing shed to the side of the house, the construction of a proposed single-storey extension to the side & rear of the house…
    Lodged
    F26A/0849EReceived 17 Sept 2026Decision due 11 Nov 2026
Every Fingal application, by week

Who is building in Swords

The organisations behind the most applications in this area.

  1. 1Gerard Gannon Properties54 applications
  2. 2DAA plc32 applications
  3. 3Glenveagh Homes Ltd24 applications
  4. 4Swords Business Campus 1 Ltd.18 applications
  5. 5Golden Port Homes Ltd17 applications
  6. 6Marron Estates12 applications
  7. 7Cairn Homes Properties Limited12 applications
  8. 8Gannon Properties8 applications

Electoral divisions in Swords

  • Airport
  • Kilsallaghan
  • Swords Village
  • Swords-Forrest
  • Swords-Glasmore
  • Swords-Lissenhall
  • Turnapin

Lead figures count planning applications and commencement notices received in the last twelve months inside this area's boundary; pipeline value is the estimated build value behind them. Applicant names of private individuals are never shown; organisations only. Boundary: CSO / Tailte Eireann National Statistical Boundaries 2022, CC BY 4.0.

Get Swords's leads, filtered to your trade.

Every site on the map, scored and sized, with alerts the week a new one is filed.