Local Electoral Area · Westmeath County Council

Construction leads in Mullingar

192 planning applications and commencement notices in Mullingar in the last twelve months, across 12 electoral divisions. 233 sites are on site right now. Updated weekly from the Westmeath planning register and the national building control register.

192
Leads, 12 months
233
On site now
€309m
Pipeline value
Boundary: CSO / Tailte Eireann 2022
Every lead in Mullingar, on the map

Pro opens the map filtered to this area: every site pinned, scored and sized, with the area shading, trade filters and alerts for new filings.

Top trades in Mullingar

The work the last twelve months of filings call for, by trade.

Electrical
155 leads
Plumbing & Heating
152 leads
Carpentry & Joinery
149 leads
Masonry & Blockwork
141 leads
Roofing
141 leads
Plastering, Rendering & Dry Lining
137 leads
Flooring
136 leads
Painting & Decorating
136 leads

The housing stock in Mullingar

10,032 households in Census 2022, set against the national figure (the dark tick). Older homes on oil and solid fuel are where retrofit demand sits.

Age and occupancy

Built before 198032.6%Ireland 41.7%
Built before 19194.4%Ireland 8.6%
Built 2011 or later5.9%Ireland 7.9%
Vacant homes6.8%Ireland 7.7%
Holiday homes0.3%Ireland 3.2%

Central heating fuel

Oil53%Ireland 40.9%
Mains gas17.5%Ireland 34.5%
LPG0.7%Ireland 0.7%
Electric12.7%Ireland 12.4%
Solid fuel (coal, peat, wood)14%Ireland 9.4%
Other fuel1%Ireland 1%
No central heating1.1%Ireland 1.2%
Renewable energy source25.8%Ireland 25.7%

Tenure

Owner occupied65.6%Ireland 68.9%
Private rented22.8%Ireland 18.8%
Social rented10.4%Ireland 10.4%
Pobal deprivation score
-2.3

Relative affluence below the national average (0). A household-weighted mean of Electoral Division scores. Pobal HP Deprivation Index 2022, CC BY 4.0.

Source: CSO Census 2022, Small Area Population Statistics, CC BY 4.0. Shares are rolled up from each electoral division, weighted by households (dwellings for vacancy).

Recent planning applications in Mullingar

  1. Zone C, Mullingar Business Park, Mullingar Co. Westmeath
    Modifications and additions to the development previously permitted under Reg. Ref. 2560104 for which no works have commenced. The development incorporates…
    Lodged
    2660511Received 23 Sept 2026Decision due 17 Nov 2026
  2. Rochfort Demesne, Moyliscor Mullingar, Co. Westmeath
    Construction of a 2-storey dwelling, a detached garage, access off public road via existing field entrance, a new proprietary wastewater treatment system…
    Lodged
    2660509Received 22 Sept 2026Decision due 16 Nov 2026
  3. 42 Clonmore Heights, Mullingar, Co. Westmeath
    the following development 1. to retain the existing extension to the side of our dwelling to include living room…
    Lodged
    2660507Received 21 Sept 2026Decision due 15 Nov 2026
  4. 4 The Court, Lakepoint Park, Mullingar Co. Westmeath
    development seeking RETENTION consists of the construction of a detached single-storey garden structure located in the rear garden of the existing house.…
    Lodged
    2660508Received 21 Sept 2026Decision due 15 Nov 2026
  5. 101 Chestnut Drive, Balinderry Mullingar, Co.Westmeath
    development which will consist of an extension to the side and rear of the existing dwelling…
    Lodged
    2660502Received 19 Sept 2026Decision due 13 Nov 2026
  6. 1 Lynn Road, Mullingar, Co. Westmeath
    Retain my existing garage at the rear of my dwelling house to include on ground floor, garage area with stairs and on first floor storage area, w.c…
    Lodged
    2660498Received 18 Sept 2026Decision due 12 Nov 2026
  7. Tudenham Park Rochfort Demesne, Mullingar, Co.Westmeath.
    development which will consist of constructing a new dwelling, garage, wastewater treatment system & percolation area and all associated site works
    Lodged
    2660497Received 17 Sept 2026Decision due 11 Nov 2026
  8. 14 St. Loman’s Terrace, Mullingar, Co. Westmeath
    construction of an extension at the rear of my existing building on the first floor to include an office…
    Lodged
    2660493Received 16 Sept 2026Decision due 10 Nov 2026
  9. 4 The Court, Lakepoint Park, Mullingar Co. Westmeath
    development seeking retention which consists of the construction of a detached single-storey garden structure located in the rear garden of the existing house…
    Closed
    2660485Received 11 Sept 2026
  10. Greatdown The Downs, Mullingar, Westmeath
    construction of a new dormer bungalow type dwelling house, domestic garage, upgrade an existing agricultural entrance to a new domestic vehicular entrance…
    Lodged
    2660487Received 11 Sept 2026Decision due 5 Nov 2026
Every Westmeath application, by week

Who is building in Mullingar

The organisations behind the most applications in this area.

  1. 1Condorf Investments ICAV12 applications
  2. 2KDM Construction Ltd4 applications
  3. 3Andrews Construction Ltd3 applications
  4. 4Mulkeen Estates3 applications
  5. 5Sheever Developments Ltd3 applications
  6. 6TEG (Technical Engineering Group)3 applications
  7. 7Trend Technologies Mullingar Limited3 applications
  8. 8McDonald's Restaurants of Ireland Ltd2 applications

Electoral divisions in Mullingar

  • Belvidere
  • Castle
  • Cloghan
  • Heathstown
  • Hopestown
  • Knockdrin
  • Mullingar North Urban
  • Mullingar Rural
  • Mullingar South Urban
  • Owel
  • Russellstown
  • Tullaghan

Lead figures count planning applications and commencement notices received in the last twelve months inside this area's boundary; pipeline value is the estimated build value behind them. Applicant names of private individuals are never shown; organisations only. Boundary: CSO / Tailte Eireann National Statistical Boundaries 2022, CC BY 4.0.

Get Mullingar's leads, filtered to your trade.

Every site on the map, scored and sized, with alerts the week a new one is filed.