Local Electoral Area · Cork County Council

Construction leads in Midleton

525 planning applications and commencement notices in Midleton in the last twelve months, across 26 electoral divisions. 542 sites are on site right now. Updated weekly from the Cork County planning register and the national building control register.

525
Leads, 12 months
542
On site now
€501m
Pipeline value
Boundary: CSO / Tailte Eireann 2022
Every lead in Midleton, on the map

Pro opens the map filtered to this area: every site pinned, scored and sized, with the area shading, trade filters and alerts for new filings.

Top trades in Midleton

The work the last twelve months of filings call for, by trade.

Electrical
422 leads
Plumbing & Heating
411 leads
Roofing
411 leads
Masonry & Blockwork
410 leads
Carpentry & Joinery
403 leads
Flooring
383 leads
Painting & Decorating
383 leads
Plastering, Rendering & Dry Lining
383 leads

The housing stock in Midleton

17,402 households in Census 2022, set against the national figure (the dark tick). Older homes on oil and solid fuel are where retrofit demand sits.

Age and occupancy

Built before 198035.5%Ireland 41.7%
Built before 191911.7%Ireland 8.6%
Built 2011 or later7.8%Ireland 7.9%
Vacant homes6%Ireland 7.7%
Holiday homes4%Ireland 3.2%

Central heating fuel

Oil49.5%Ireland 40.9%
Mains gas24.9%Ireland 34.5%
LPG2%Ireland 0.7%
Electric12.7%Ireland 12.4%
Solid fuel (coal, peat, wood)7.6%Ireland 9.4%
Other fuel1.4%Ireland 1%
No central heating1.9%Ireland 1.2%
Renewable energy source31.1%Ireland 25.7%

Tenure

Owner occupied71.5%Ireland 68.9%
Private rented16.5%Ireland 18.8%
Social rented10.1%Ireland 10.4%
Pobal deprivation score
+2.32

Relative affluence above the national average (0). A household-weighted mean of Electoral Division scores. Pobal HP Deprivation Index 2022, CC BY 4.0.

Source: CSO Census 2022, Small Area Population Statistics, CC BY 4.0. Shares are rolled up from each electoral division, weighted by households (dwellings for vacancy).

Recent planning applications in Midleton

  1. Corbally South, Lisgoold, Midleton, Co.Cork
    Construct detached bungalow with domestic effluent treatment plant, vehicular site entrance and all associated development works
    Lodged
    26/2630Received 12 Oct 2026Decision due 7 Dec 2026
  2. Glór Na Mara, Ballycotton, Co. Cork
    Revisions to the design of the dwelling house previously granted planning permission under Ref. 25/5324…
    Lodged
    26/2631Received 12 Oct 2026Decision due 7 Dec 2026
  3. Barrafohona, Ballynoe, Mallow, Co.Cork, T51 H0FH
    Planning permission for retention for the conversion of the attic to living accommodation…
    Lodged
    26/2620Received 9 Oct 2026Decision due 3 Dec 2026
  4. Glanagow and Corkbeg (townlands), Whitegate, Co. Cork, within a total site area of 3.21 hectares within the curtilage of the Whitegate Power Station.
    10-year permission for the construction of a Battery Energy Storage System (BESS) facility comprising of 80 containerised lithium-ion BESS units on skids…
    Lodged
    26/2621Received 9 Oct 2026Decision due 3 Dec 2026
  5. Trabolgan Holiday Centre, Trabolgan, Whitegate Co. Cork, P25H953
    100% renewable energy, ground mounted, solar array consisting of 520 solar PV panels (630 kWp)…
    Lodged
    26/2624Received 9 Oct 2026Decision due 3 Dec 2026
  6. Orchid Meadows’, New Water Rock Road, Knockgriffin (Imokilly), Knockgriffin (Barrymore) and Water Rock, Midleton, Co. Cork
    We, Bluemont Developments (Midleton) Limited, intend to apply for permission on lands at ‘Orchid Meadows’, New Water Rock Road, Knockgriffin (Imokilly)…
    Lodged
    26/2606Received 8 Oct 2026Decision due 2 Dec 2026
  7. 9 Cherrywood Heights, Midleton, Co.Cork., P25 WP02
    Permission for Retention for the construction of a single storey living room extension to the rear elevation of the existing two storey semi-detached dwelling
    Lodged
    26/2568Received 5 Oct 2026Decision due 30 Nov 2026
  8. 10, Tom Clarke Terrace, Midleton, Co. Cork.
    1) remove existing single-storey rear lean-to roof attached to her existing dwelling, 2) Construct a new single-storey rear extension to her existing dwelling…
    Lodged
    26/2572Received 5 Oct 2026Decision due 30 Nov 2026
  9. Geragh, Ballinacurra, Midleton, Cork, P25AH97
    Construct a new detached single storey granny flat, install a new wastewater treatment unit & percolation area to serve both existing dwelling onsite…
    Lodged
    26/2573Received 5 Oct 2026Decision due 30 Nov 2026
  10. Broomfield West, Mill Road, Midleton, Co.Cork
    New two-storey dwelling house, new vehicular entrance (Change of plan to that previously granted under pl.reg.no. 23/5362) and all associated site works
    Lodged
    26/2574Received 5 Oct 2026Decision due 30 Nov 2026
Every Cork County application, by week

Who is building in Midleton

The organisations behind the most applications in this area.

  1. 1Aghada GAA Club3 applications
  2. 2Glenveagh Homes Ltd2 applications
  3. 3BNRG Ballyduff Ltd2 applications
  4. 4Chriselle Holding Ltd2 applications
  5. 5Electricity Supply Board (ESB)2 applications
  6. 6Killeagh Pharmacy Ltd2 applications
  7. 7O.R.M Unlimited Company2 applications
  8. 8Perigus Energy Ireland Midco Ltd1 application

Electoral divisions in Midleton

  • Ardagh
  • Ballintemple
  • Ballycottin
  • Ballyspillane
  • Castlemartyr
  • Clonmult
  • Clonpriest
  • Cloyne
  • Corkbeg
  • Dangan
  • Dungourney
  • Garryvoe
  • Ightermurragh
  • Inch
  • Kilcronat
  • Killeagh
  • Kilmacdonogh
  • Lisgoold
  • Midleton Rural
  • Midleton Urban
  • Mogeely
  • Rostellan
  • Templebodan
  • Templenacarriga
  • Youghal Rural
  • Youghal Urban

Lead figures count planning applications and commencement notices received in the last twelve months inside this area's boundary; pipeline value is the estimated build value behind them. Applicant names of private individuals are never shown; organisations only. Boundary: CSO / Tailte Eireann National Statistical Boundaries 2022, CC BY 4.0.

Get Midleton's leads, filtered to your trade.

Every site on the map, scored and sized, with alerts the week a new one is filed.