Local Electoral Area · Limerick City and County Council

Construction leads in Limerick City West

291 planning applications and commencement notices in Limerick City West in the last twelve months, across 15 electoral divisions. 281 sites are on site right now. Updated weekly from the Limerick planning register and the national building control register.

291
Leads, 12 months
281
On site now
€835m
Pipeline value
Boundary: CSO / Tailte Eireann 2022
Every lead in Limerick City West, on the map

Pro opens the map filtered to this area: every site pinned, scored and sized, with the area shading, trade filters and alerts for new filings.

Top trades in Limerick City West

The work the last twelve months of filings call for, by trade.

Electrical
233 leads
Plumbing & Heating
222 leads
Carpentry & Joinery
201 leads
Flooring
201 leads
Painting & Decorating
201 leads
Plastering, Rendering & Dry Lining
201 leads
Masonry & Blockwork
191 leads
Roofing
191 leads

The housing stock in Limerick City West

14,481 households in Census 2022, set against the national figure (the dark tick). Older homes on oil and solid fuel are where retrofit demand sits.

Age and occupancy

Built before 198036.5%Ireland 41.7%
Built before 19199%Ireland 8.6%
Built 2011 or later5.7%Ireland 7.9%
Vacant homes6.3%Ireland 7.7%
Holiday homes0.1%Ireland 3.2%

Central heating fuel

Oil21.5%Ireland 40.9%
Mains gas49.6%Ireland 34.5%
LPG0.5%Ireland 0.7%
Electric23.1%Ireland 12.4%
Solid fuel (coal, peat, wood)2.6%Ireland 9.4%
Other fuel0.9%Ireland 1%
No central heating1.7%Ireland 1.2%
Renewable energy source15.5%Ireland 25.7%

Tenure

Owner occupied53.1%Ireland 68.9%
Private rented36.1%Ireland 18.8%
Social rented9.5%Ireland 10.4%
Pobal deprivation score
+3.06

Relative affluence above the national average (0). A household-weighted mean of Electoral Division scores. Pobal HP Deprivation Index 2022, CC BY 4.0.

Source: CSO Census 2022, Small Area Population Statistics, CC BY 4.0. Shares are rolled up from each electoral division, weighted by households (dwellings for vacancy).

Recent planning applications in Limerick City West

  1. 3 Ballinacurra Gardens, Limerick City, Co. Limerick
    the removal of existing front boundary wall and entrance pier and permission to construct parking area at front of dwelling and permission to construct new…
    Lodged
    2661151Received 3 Oct 2026Decision due 27 Nov 2026
  2. Plunkett House, Dooradoyle Road Dooradoyle, Limerick
    a low-rise, medium-density residential infill development ranging from one to three storeys in height…
    Lodged
    2661147Received 2 Oct 2026Decision due 26 Nov 2026
  3. Saint Paul's National School, Springfield Drive, Dooradoyle
    a 1.2m high palisade fence present along the north eastern boundary, a 2.4m high gate across the car park entrance road within the campus along with associated…
    Lodged
    2661150Received 2 Oct 2026Decision due 26 Nov 2026
  4. No.35 Cecil Street, Limerick
    a) the change of use of the ground floor from commercial use to residential use, b) the change of use of the first…
    Lodged
    2661144Received 1 Oct 2026Decision due 25 Nov 2026
  5. The Old Girls' School, Baunacloka, Mungret Co. Limerick.
    the change of use from a childcare facility to a single dwelling, minor internal alterations and all associated works. The school is a Protected Structure (RPS…
    Lodged
    2661117Received 25 Sept 2026Decision due 19 Nov 2026
  6. No. 4 Bedford Row No. 5 Bedford Row No. 6 Bedford Row &, No. 7 Bedford Row/Henry Street No. 8 Henry Street and No. 9 Henry Street, Limerick.
    amalgamation of No. 8 Henry Street and No. 9 Henry Street at ground floor level; Creation of a new connection to The Savoy Hotel…
    Lodged
    2661108Received 24 Sept 2026Decision due 18 Nov 2026
  7. 17-19 Patrick St., Limerick
    material change of use and material alterations of existing office building into thirty five (35) short stay ensuite tourist accommodation units…
    Lodged
    2661113Received 24 Sept 2026Decision due 18 Nov 2026
  8. Corner of 19 Henry Street / Lower Glentworth Street, Limerick
    the erection of retractable canopies with signage, fixed seating and all associated site works
    Lodged
    2661098Received 21 Sept 2026Decision due 15 Nov 2026
  9. Unit 2 Blackberry Business Park, Dock Road, Limerick
    the construction of a ground and first floor extension to the existing office/workshop building at Unit 2…
    Lodged
    2661092Received 18 Sept 2026Decision due 12 Nov 2026
  10. Tervoe, Clarina, Co Limerick
    the construction of an all-weather Astro turf pitch including associated perimeter fencing and ancillary facilities…
    Lodged
    2661094Received 18 Sept 2026Decision due 12 Nov 2026
Every Limerick application, by week

Who is building in Limerick City West

The organisations behind the most applications in this area.

  1. 1Voyage Property Limited22 applications
  2. 2HOMELAND QCM LIMITED9 applications
  3. 3Eli Lilly (Kinsale) Limited7 applications
  4. 4Analog Devices International Unlimited Company6 applications
  5. 5Regeneron Ireland DAC5 applications
  6. 6Nessan Property Ltd5 applications
  7. 7Henry Street Developments Limited4 applications
  8. 8Kirkland Investments Ltd4 applications

Electoral divisions in Limerick City West

  • Ballinacurra A
  • Ballinacurra B
  • Ballycummin
  • Carrig
  • Clarina
  • Custom House
  • Dock A
  • Dock B
  • Dock C
  • Dock D
  • Patrickswell
  • Prospect A
  • Prospect B
  • Shannon A
  • Shannon B

Lead figures count planning applications and commencement notices received in the last twelve months inside this area's boundary; pipeline value is the estimated build value behind them. Applicant names of private individuals are never shown; organisations only. Boundary: CSO / Tailte Eireann National Statistical Boundaries 2022, CC BY 4.0.

Get Limerick City West's leads, filtered to your trade.

Every site on the map, scored and sized, with alerts the week a new one is filed.