Planning application · Limerick City and County Council

(a) The restoration and infilling of the existing and future void over an area of (c…

Roadstone Barrigone Quarry , in the townland of Glenbane East , Askeaton

23294 · LimerickClosed
Reference
23294
Planning authority
Limerick City and County Council
Received
6 Jun 2023
Decided
9 May 2024
Status
Closed
Further information requested
28 Jul 2023
Further information received
15 Mar 2024

Proposed development

the development will consist of: (a) The restoration and infilling of the existing and future void over an area of (c. 17.2 ha) of existing permitted quarry (05/7029 and ABP 13.QC.2098) using approximately 2,464,000m3 or 4,435,200 tonnes of inert soil and stone material or stone by-product, or river dredge spoil. (b) The development will consist of the restoration of the void with either: (1) Inert soil and stone waste (imported inert greenfield and non-greenfield soils and stone, and river dredge spoil) which will result in the Proposed Development operating as a soil recovery facility that requires a waste management licence from the EPA; or, (2) Soil and stone by-product (i.e. essentially virgin soil or equivalent to virgin soil and stone) which will be notified to the EPA as an Article 27 by-product at its source of origin and transported as a by-product material to enable the Site to be restored. The Site would then operate under conditions of planning. (c) The proposed development will utilise the permitted quarry infrastructure including internal roads, site office, weighbridge, wheel wash, welfare facilities and other ancillaries to complete the works. (d) Stockpiling of topsoil removed during quarrying for future implementation of a restoration plan. (e) Construction of a soil inspection shed (approximately 120m2 in area, 4m height) and refuelling area (hardstanding) located to the west of the existing site office (approximately 16m2 hardstanding area. (f) Decommissioning and disposal of existing fuel tanks at an appropriately licensed offsite waste facility. (g) Associated minor works to include site access road improvements (resurfacing), upgrade of drainage infrastructure including new fuel/oil interceptor and surface drains on hardstanding. (h) Existing weighbridge and wheel wash upgrades. (i) Demolition of other buildings/structures. An Environmental Impact Assessment Report (EIAR) and Natura Impact Statement (NIS) accompanies the planning application. The development comprises an activity that may require a Waste License

What happens next

Permission was refused on 9 May 2024. The applicant may appeal within four weeks of the decision.

For the applicant

Is this your application?

Sign in to follow it through the Limerick planning process, get told when the decision lands, and see which builders and trades are working on similar projects near you. It is free and takes an email address.

Follow this applicationNo cold calls. Nothing is shared unless you choose to.

Nearby applications

Other applications on the Limerick register close to this address.

All Limerick planning applications

About this page: the facts above come from the statutory public planning register kept by Limerick City and County Council and are refreshed weekly (last updated 10 Aug 2026). Applicant names and contact details are not shown. Status labels are PlanningLeads' plain-language reading of the register status and the "Use" label is classified by AI from the public description (see how we use AI); neither is legal advice and the council's file is the record. How we handle this data: privacy notice.

Remove my application from this page

If this is your application and you would rather it did not appear here, tell us and we will take the page down. No account, no questions asked. This is your right to object under GDPR Article 21.