Planning application · Mayo County Council

114 Megawatt gas fired peaking power plant (which will be capable of running on a mix…

Croaghaun West Srahnakilly and Bellacorick townlands , Bellacorick , Co. Mayo

2360028 · MayoGranted
Reference
2360028
Planning authority
Mayo County Council
Received
7 Feb 2023
Decided
22 Dec 2023
Status
Granted
Site area
4.35 ha
Further information requested
30 Mar 2023
Further information received
15 Nov 2023

Proposed development

The development will consist of a 114 Megawatt gas fired peaking power plant (which will be capable of running on a mix of natural gas and hydrogen) comprising the ’electricity generating station’. The electricity generating station will comprise of 2 no. open cycle gas turbine (OCGT) generators each consisting of an air intake filter system, exhaust stack (28 metres high), air vent stack, inter cooler system, turbine control room and transformers. In addition the development will include: • Above Ground Installation (AGI) to facilitate connection to the Gas Network, with compound area of 1,600 m²; • 3 no. Gas AGI buildings; • Admin & welfare block; • Electrical Substation with area of 3,800 m²; • 1 no. Substation building; • Electrical building; • 3 no. Secondary fuel storage tanks with volume of 3,600 m³; • Fire Water Storage Tank & Pumphouse; • Sludge Tank & Pump House; • Resurfacing, Repair and Improvement of Existing Site Entrance; • Replacement Bridge; • Gatehouse; • Internal Access Roads; and • Associated Grid Connection Works within the L52925 Public Roadway. The development will include the provision of 12 no. parking spaces, footpaths, landscaping, fencing and all other associated site development plant and equipment and other works including surface water and foul wastewater drainage infrastructure. The development includes for the demolition and removal of a dwelling (112 m²) and associated farmyard barn and outbuildings (94 m², 15 m², 17 m² and 45 m²), all within a total overall application boundary of 4.35 ha. It should be noted in respect of this planning application that permission is sought for a period of 25 years.

What happens next

Permission was granted on 22 Dec 2023. Third parties may appeal within four weeks; after that the permission is final and works can start once a commencement notice is lodged.

For the applicant

Is this your application?

Sign in to follow it through the Mayo planning process, get told when the decision lands, and see which builders and trades are working on similar projects near you. It is free and takes an email address.

Follow this applicationNo cold calls. Nothing is shared unless you choose to.

Nearby applications

Other applications on the Mayo register close to this address.

All Mayo planning applications

About this page: the facts above come from the statutory public planning register kept by Mayo County Council and are refreshed weekly (last updated 7 Jul 2026). Applicant names and contact details are not shown. Status labels are PlanningLeads' plain-language reading of the register status and the "Use" label is classified by AI from the public description (see how we use AI); neither is legal advice and the council's file is the record. How we handle this data: privacy notice.

Remove my application from this page

If this is your application and you would rather it did not appear here, tell us and we will take the page down. No account, no questions asked. This is your right to object under GDPR Article 21.