Planning application · Galway City Council

RED III Permission for development which consists…

Merlin Park Industrial Estate and Doughiska Road , Townland of Doughiska , Galway Co. Galway

2560319 · GalwayGranted
Reference
2560319
Planning authority
Galway City Council
Received
16 Oct 2025
Decided
10 Dec 2025
Status
Granted
Site area
4.63 ha

Proposed development

RED III Permission for development which consists of: the construction and operation of a development consisting of an energy centre building, heat network pipeline, landscaping works, roof mounted solar PV and all other associated ancillary infrastructure at the Merlin Park Industrial Estate and Doughiska Road, within the townland of Doughiska, Galway, Co. Galway. The Galway City East Energy Centre building will integrate multiple low carbon energy technologies. The development will include the installation of 2no. Air Source Heat Pumps (ASHPs) each with a 1.5MW capacity, 2 no. electric boilers, each with a 1.5MW capacity to handle peak loads and temperatures, and 2 no. gas boilers, each with a 1.5MW capacity for emergency back up support. The proposed energy centre building will have a building height of 6.2m, with solar PV panels mounted on the building rooftop. The adjacent building to the east (Smurfit Westrock), will have solar PV panels mounted on the building rooftop. The building to the north (Value Centre), will also have roof mounted solar panels. The proposed development will also include a heat pipeline network consisting of 2no. pipes, with a maximum diameter of 450mm each, spanning a distance of circa. 2390m in an underground trench, from the proposed energy centre building to Doughiska Road, along the length of Doughiska Road, crossing Monivea Road to the north, terminating outside the Clayton Hotel, and crossing Old Dublin Road to the south, terminating outside the Castlegar GAA Club, linking the proposed Galway City East Energy Centre building to future heat customer buildings in the area. Ancillary development will consist of security fencing, access and parking, drainage infrastructure, and landscaping works at the proposed energy centre building. Site preparation will involve foundation works, and construction of essential access facilities to support overall functionality for the purpose of generating renewable heat energy and transmitting it to future heat customer buildings within the townland of Doughiska, Galway Co. Galway (the Proposed Development). Permission is sought for a ten year construction period.

What happens next

Permission was granted on 10 Dec 2025. Third parties may appeal within four weeks; after that the permission is final and works can start once a commencement notice is lodged.

For the applicant

Is this your application?

Sign in to follow it through the Galway planning process, get told when the decision lands, and see which builders and trades are working on similar projects near you. It is free and takes an email address.

Follow this applicationNo cold calls. Nothing is shared unless you choose to.

Nearby applications

Other applications on the Galway register close to this address.

All Galway planning applications

About this page: the facts above come from the statutory public planning register kept by Galway City Council and are refreshed weekly (last updated 6 Jul 2026). Applicant names and contact details are not shown. Status labels are PlanningLeads' plain-language reading of the register status and the "Use" label is classified by AI from the public description (see how we use AI); neither is legal advice and the council's file is the record. How we handle this data: privacy notice.

Remove my application from this page

If this is your application and you would rather it did not appear here, tell us and we will take the page down. No account, no questions asked. This is your right to object under GDPR Article 21.