Planning application · Cork County Council

Development of the "Aghada LDES" (Aghada Long Duration Energy Storage) project…

The townland of Ballincarroonig, Aghada, County Cork, within the wider ESB landholding

26/1782 · CorkLodged
Reference
26/1782
Planning authority
Cork County Council
Received
2 Jul 2026
Status
Lodged
Application type
industrial
Use
other

Proposed development

Electricity Supply Board (ESB) intend to apply for planning permission for the development of the "Aghada LDES" (Aghada Long Duration Energy Storage) project comprising a Battery Energy Storage System (BESS) with a capacity of up to 300 MW on 4.65 Ha of lands located in the townland of Ballincarroonig, Aghada, County Cork, within the wider ESB landholding. The proposed development will consist of a fenced compound containing a BESS compound and Customer HV Compound. Specifically, the BESS compound will feature up to 200 No. 20 ft battery energy storage system (BESS) enclosures and up to 20 No. Medium Voltage (MV) Skids / Twin Inverter Skids and associated bunds. Associated ancillary equipment includes 1 no. MV switchgear building consisting of 2 no. adjoining prefabricated buildings, 1 no. Control Building, 5 no. LV Switchgear Containers, a fire water tank and pumphouse, Operation and Maintenance site offices (O&M portacabin) including welfare facilities, 3 no. spare parts stores (20-40 ft containers), 1 no. backup diesel generator plinth, an underground fire water retention tank, a surface water soakaway, harmonics structure (if required following testing of equipment), all services connections including electrical, potable water and connections to surface water drains, external lighting poles, CCTV, lighting monopole. The proposed Customer HV Compound will comprise Grid Step-up Transformers and associated bunds and fire walls, 5 No. Auxiliary Transformers and associated bunds, associated electrical equipment including current transformers/voltage transformers (CT/VT) Circuit Breakers, Neutral Earth Resistors, Cable Chairs, and Line Earth Disconnects, external lighting poles, CCTV, lightning monopole. The development proposal also includes a new site access road from the existing Aghada station, access gate, palisade fencing to secure both compounds (2.6m high) and all ancillary site clearance and development works including provision of areas of hard standing, internal access roads, laydown area, car parking and connections to site services and networks.

What happens next

The application has been lodged and validated. The council has eight weeks to decide, unless it asks for further information.

For the applicant

Is this your application?

Sign in to follow it through the Cork planning process, get told when the decision lands, and see which builders and trades are working on similar projects near you. It is free and takes an email address.

Follow this applicationNo cold calls. Nothing is shared unless you choose to.

About this page: the facts above come from the statutory public planning register kept by Cork County Council and are refreshed weekly (last updated 20 Jul 2026). Applicant names and contact details are not shown. Status labels are PlanningLeads' plain-language reading of the register status and the "Use" label is classified by AI from the public description (see how we use AI); neither is legal advice and the council's file is the record. How we handle this data: privacy notice.

Remove my application from this page

If this is your application and you would rather it did not appear here, tell us and we will take the page down. No account, no questions asked. This is your right to object under GDPR Article 21.