Development is sought for a period of 10 years at a 10.22 hectares site within ESB Aghada…

ESB Aghada Generating Station Ballincarroonig Aghada Co Cork

23/5104 · CorkGranted
Reference
23/5104
Planning authority
Cork County Council
Received
6 Jun 2023
Decided
2 Nov 2023
Status
Granted

Proposed development

Development is sought for a period of 10 years at a 10.22 hectares site within ESB Aghada Generating Station consisting of 1) Construction/installation of an open cycle gas turbine (OCGT) generating unit and associated plant and equipment, comprising the following main components with approximate dimensions as stated : Gas turbine air intake [24m x 18m x 26m high], Generator enclosure [24m x 18m x 14.5m high], Gas turbine enclosure [53m x 15m x 26m high], Exhauster diffuser [14.5m x 10.4m x 10.5m high], Exhaust stack [40m high, 8m diameter], Gas turbine control and electrical modules [20.5m x 18m x 10m high], Fin fan coolers [27m x 19m x 8m high], Main transformer [12.2m x 7.5m x 8.5m high] including 17.6m x 17.9m concrete bund; and 2 no. 12m high concrete blast walls, Auxiliary transformer [5m x 4.7m x 7.5m high] including 6.8m x 7.5m concrete bund; and 2 no. 12m high concrete blast walls, Demineralised water treatment plant [20m x 10m x 5.4m high], Demin water storage tank [14.63m high x 24.4m diameter], Raw water/Firewater storage tank [14.63m high x 15.2m diameter], Fuel oil storage tanks [two, each 12.19m high x 17.4, diameter], including 67m x 35m concrete bund, Fuel oil forwarding pumps [6m x 10m x 2.2m high], Firefighting pumphouse [10m x 7m x 5.4m high], Gas conditioning compound [42.3m x 11.5m x 6m high]. Above ground installation gas compound expansion [23m x 73m], Indoor switchgear building [20m x 30m x 18m high], Emergency diesel generator <1 MW [10m x 4m x 5m high], Generator circuit breaker [8.8m x 5.1m x 4m high], Continuous emissions monitoring skid [3.5 m x 2.5m x 5m high], Workshop/Stores/Administration building [35.9m x 12m x 15m], Hydrogen storage compound [8m x 4m x 2m high], Surface water drainage system, Vehicle parking, Internal roadways, 2) Demolition of an existing single storey stores building, 3) connection to the existing on-site above ground installation (AGI), 4) Connection to the National Grid by means of underground cable to existing on-site 220kV substation, 5) All associated works to facilitate the development such as temporary construction compounds, perimeter fencing, use of an existing access to public road, above ground pipe racks, underground cables on the site and crossing the R630 roadway, site lighting and telecommunications. The development consists of an activity for which an Industrial Emissions Licence is required. ESB Aghada Generating Station is a registered lower tier establishment under the Control of Ma

What happens next

Permission was granted on 2 Nov 2023. Third parties may appeal within four weeks; after that the permission is final and works can start once a commencement notice is lodged.

For the applicant

Is this your application?

Sign in to follow it through the Cork planning process, get told when the decision lands, and see which builders and trades are working on similar projects near you. It is free and takes an email address.

Follow this applicationNo cold calls. Nothing is shared unless you choose to.

About this page: the facts above come from the statutory public planning register kept by Cork County Council and are refreshed weekly (last updated 2 Jul 2026). Applicant names and contact details are not shown. Status labels are PlanningLeads' plain-language reading of the register status and the "Use" label is classified by AI from the public description (see how we use AI); neither is legal advice and the council's file is the record. How we handle this data: privacy notice.

Remove my application from this page

If this is your application and you would rather it did not appear here, tell us and we will take the page down. No account, no questions asked. This is your right to object under GDPR Article 21.