Planning application · Cork County Council

A wind farm with an operational lifespan of 30 years, from commissioning…

Shronagree Ballybane East & Knockroe townlands Ballydehob and Letterlicky Middle Bantry, Co. Cork

22/800 · CorkIn Assessment
Reference
22/800
Planning authority
Cork County Council
Received
23 Dec 2022
Decision due
27 Feb 2023
Status
In Assessment

Proposed development

A wind farm with an operational lifespan of 30 years, from commissioning, which will connect to the national grid. The proposed wind farm will consist of 7 no. wind turbines with blade tip heights of up to a maximum of 150 metres, and associated foundations and hardstand areas. The proposed development includes a site substation compound with security fencing and a single storey control building and associated loop-in infrastructure to tie into an existing 38kV overhead transmission line, underground cabling, drainage and service infrastructure, bored well, 1 no. permanent meteorological mast of 92 metres in height, tree felling and a temporary construction compound. The development includes landscaping and all associated ancillary development works. Vehicular access will be via an upgraded existing site entrance off the L8456 local road with provision made for the upgrade of existing on-site tracks and the construction of new on-site access roads. It will also include widening of two junctions along the turbine delivery route. The first is at the N71 - R592 junction in Knockroe townland, east of Ballydehob. These works will consist of the temporary removal of a section of masonry wall, public street lighting stanchion, gate, gate posts, trees and earthen berm and the raising of levels with engineered fill to that of the adjacent N71. The second is at the N71 - L8456 junction in Shronagree townland. These works will consist of the lowering of ground levels to that of the adjacent N71 and L8456 and the removal of traffic signage. Both locations to be restored following turbine delivery. An Environmental Impact Assessment Report (EIAR) and a Natural Impact Statement (NIS) have been prepared and will be submitted to the Planning Authority with the application.

What happens next

The council is assessing the application. Submissions from the public are taken in the first five weeks. The council's decision is due by 27 Feb 2023.

For the applicant

Is this your application?

Sign in to follow it through the Cork planning process, get told when the decision lands, and see which builders and trades are working on similar projects near you. It is free and takes an email address.

Follow this applicationNo cold calls. Nothing is shared unless you choose to.

About this page: the facts above come from the statutory public planning register kept by Cork County Council and are refreshed weekly (last updated 2 Jul 2026). Applicant names and contact details are not shown. Status labels are PlanningLeads' plain-language reading of the register status and the "Use" label is classified by AI from the public description (see how we use AI); neither is legal advice and the council's file is the record. How we handle this data: privacy notice.

Remove my application from this page

If this is your application and you would rather it did not appear here, tell us and we will take the page down. No account, no questions asked. This is your right to object under GDPR Article 21.