Planning application · Cork County Council

Demolition, site infrastructure improvements, and utility upgrade works to stabilise…

Belvelly Port Facility Marino Point In the townlands of Marino, Belvelly and Oldcourt Cobh, Co. Cork

19/6783 · CorkIn Assessment
Reference
19/6783
Planning authority
Cork County Council
Received
22 Nov 2019
Decided
22 Jul 2020
Status
In Assessment

Proposed development

Demolition, site infrastructure improvements, and utility upgrade works to stabilise the existing site and to provide capacity for future industrial development proposals at the Belvelly Port Facility. Demolition will comprise site clearance and demolition of all existing derelict super structures, including prill tower, concrete tanks, workshops, stores and office buildings; sub structures including foundations and floorslabs; and redundant services including piperacks, sumps and sea water cooling pipe. Site infrastructure improvements will comprise; i. Infilling of the lagoon located at the north east of the site using a combination of imported material and suitable site-won demolition material; ii. Site levelling works and construction of a flood protection revetment along the northern and north western perimeter of the site; iii. Upgrade of existing main site entrance and provision of new emergency access along the north eastern frontage of the site; new internal road layout and site lighting along the new roads; iv. Development of a new railway connection along the eastern boundary and restoration of the former rail siding at the north east of the site; v. Widening of access road and bridge to the jetty; vi. Tree planting along the northern and western boundary. Utility upgrade works will comprise; vii. Provision of surface water drainage system, which includes treatment and disposal via outfalls to Cork Harbour; viii. Provision of a foul effluent drainage system, on-site treatment via a wastewater treatment plant and discharge along the path of an existing outfall into Cork Harbour; ix. Provision of fire water infrastructure along the new internal roadways and on the jetty; x. Provision of site services, including potable water supply, new electrical infrastructure including a 10kV on-site substation and ducting for extra-low voltage and low voltage connection points; xi. Diversion of natural gas, methanol and mains water pipelines. An Environmental Impact Assessment Report (EIAR) has been prepared and will be submitted to the planning authority with the application. A Natura Impact Statement (NIS) will be submitted to the planning authority with the application.

What happens next

The council recorded a decision on 22 Jul 2020. The official file has the outcome; a third-party appeal is possible within four weeks of the decision.

For the applicant

Is this your application?

Sign in to follow it through the Cork planning process, get told when the decision lands, and see which builders and trades are working on similar projects near you. It is free and takes an email address.

Follow this applicationNo cold calls. Nothing is shared unless you choose to.

Nearby applications

Other applications on the Cork register close to this address.

All Cork planning applications

About this page: the facts above come from the statutory public planning register kept by Cork County Council and are refreshed weekly (last updated 2 Jul 2026). Applicant names and contact details are not shown. Status labels are PlanningLeads' plain-language reading of the register status and the "Use" label is classified by AI from the public description (see how we use AI); neither is legal advice and the council's file is the record. How we handle this data: privacy notice.

Remove my application from this page

If this is your application and you would rather it did not appear here, tell us and we will take the page down. No account, no questions asked. This is your right to object under GDPR Article 21.